结构成本(Structure cost).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
结构成本(Structure cost)

结构成本(Structure cost) The present situation only controls the structural cost from the economic indicators The inherent idea emphasizes the structural cost control extremely, and thinks that the lower the steel content and the concrete content, the better the structural design. The development of modern cost management theory: 1., horizontal extension: expanding the scope to various fields, from the value analysis to the risk analysis, and comprehensively analyzing the input-output ratio of the project from the systematic point of view. 2. vertical extension: the management time is extended to the bidding stage, extended to the use and maintenance stage, so that the project cost in its entire project life cycle to optimize. Connotation of cost management Cost management objective: optimization of input-output ratio of project life cycle. 1. control process: A. project demonstration, B. project planning stage, C. design preparation, D. design, e. bidding, F. construction, G. put into use stage 2., work nature: A. technical work, B. economic work, C. management work 3. control measures: A. organizational measures, B. technical measures, C. economic measures, D. contract measures Train of thought and method I. the entire design and planning process must be managed 1., preliminary planning: Geological considerations 2. planning stage: the location of buildings 3. stage: feasibility and rationality of structure and avoid rework 4. expansion stage: optimization of structure scheme 5. construction stage: fine design of structure 6. construction coordination stage: change, visa reasonable control Conclusion: prior control is the most important thing! Two. Several points of prior control 1. selection of Design Institute (beginning and construction stage) A. is easy to handle B. takes attitude seriously C. project status D. service consciousness E. market reputation 2., the choice of professional leaders A. performance level B. market feedback (drawing quality, responsibility

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档