- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
下沉卫生间处理方法(Sinking toilet treatment method)
Sinking type toilet filling method
2009-08-04
In order to flexibly arrange toilet facilities and meet the needs of human habitation, the house now uses sunken toilets. The owner can according to their actual needs to change the drainage pipe, no longer need to go to war as before, even the floor shifter utility transformation.
However, while bringing flexibility and convenience, sink toilets also bring us a number of potential risks, higher water treatment requirements, construction difficulties and cost will be higher. Some careless construction units in order to save trouble, often only sink toilets for simple and crude treatment, filling is also a variety of, and even the construction waste backfill. Although this may not be seen in the short term what will be the problem, but with the passage of time, it is prone to water seepage or floor collapse and other issues.
To this end, we have arranged the correct sink type toilet backfill treatment methods are as follows:
Step 1: do two times waterproof coating, these two times waterproof must be done together with the wall, the wall should be higher than the height of 40 cm above the caisson. Ensure that the upper layer of water seepage will not be extended to the perimeter, only to drain the floor drain.
Step 2: the red brick or the concrete makes the partition overhead, divides the caisson into several 400*400 about the lattice. This step, many people do not do, in fact, this is a very important step, with such a load-bearing partition, the above mud layer will not fall down. Otherwise, a few years later, the bathroom floor subsidence, cracking, leakage.
Step 3: fill ceramsite or cinder. Fill in the damp ceramsite and the lattice, dont press it too tight, naturally, because it is not load-bearing, only absorb the water vapor.
Step 4: cloth reinforcement. A 200mm*200mm square steel mesh consisting of 5 mm of steel reinforcement is arranged above the lattice to ensure the fir
您可能关注的文档
- 奶茶的制作方法(Method for making milk tea).doc
- 奶爸(Daddy).doc
- 奶茶店饮品操作细则(Milk tea shop beverage operation rules).doc
- 奶昔(Milkshake).doc
- 奶牛外观(Cow appearance).doc
- 男女前一定要牢记10句话(Men and women must remember 10 words).doc
- 男鬼(Male ghost).doc
- 男女士服装尺码对照表(Men's clothing size comparison chart).doc
- 男人的大脑与女人的大脑有什么不同(What is the difference between a man's brain and a woman's brain).doc
- 男人要有真本事(A man needs real ability).doc
- 下厨房(go to the kitchen).doc
- 下穿既有线K803+860桥梁道路施工方案(Construction plan of K803+860 Bridge Road under existing line).doc
- 下酒菜的搭配(Collocation of snacks).doc
- 下载记金华的双龙洞(Download the Double Dragon Cave in Jinhua).doc
- 下消化道出血的诊断与鉴别诊断(Diagnosis and differential diagnosis of lower gastrointestinal bleeding).doc
- 严复的翻译理论(Yan Fu's translation theory).doc
- 严格管理水资源 推进水利新跨越(Strict management of water resources and new leap of water conservancy).doc
- 严重胸部创伤合并肺挫伤的早期诊断与治疗(Early diagnosis and treatment of severe chest trauma combined with pulmonary contusion).doc
- 严重胸部损伤合并颅脑伤的早期诊治(Early diagnosis and treatment of severe chest trauma combined with craniocerebral trauma).doc
- 业绩评估的困境与策略(The dilemma and strategy of performance evaluation).doc
原创力文档


文档评论(0)