烟囱防腐方案(Chimney Anticorrosion Scheme).docVIP

烟囱防腐方案(Chimney Anticorrosion Scheme).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
烟囱防腐方案(Chimney Anticorrosion Scheme) This project belongs to high structure construction of high, difficult, and complicated construction process, but I have a number of theoretical and practical experience, able to fight the high professional construction team, whether in management or construction technology are qualified for the requirements of the project. 2 、 construction target: 2.1, duration target: duration is 20, sunny, complete all works. 2.2, quality objectives: sectional acceptance rate of 100%, excellent rate of more than 95%, more than 90% engineering sense. 2.3. Cost objective: to ensure the quality and safety of the project, and to save the project cost by means of effective management 17%. 2.4, security objectives: adhere to the safety first, prevention first policy, to ensure that the general accident frequency is less than 1.5 per thousand, the rate of death is zero, to prevent major accidents. 2.5, civilized construction, environmental protection objectives: strengthening the scientific management of construction site, construction to meet environmental protection requirements, establish a humanistic image of the project, and create a municipal civilized site. 2.6, scientific and technological progress objectives: the project as a professional demonstration project of science and technology, scientific and technological progress rate of 1.5 per 1000. 2.7, service goal: establish the owner to meet the construction process, at the same time to ensure the quality of the project. 2.8, in the normal circumstances, the rate of 90%, the shelf life of 5 years, the quality of gold stay 5%; stay for 3 years. 3, construction deployment 3.1 main construction measures: 3.1.1, the use of foot free high-altitude suspension works. 3.1.2, artificial rust removal. 3.1.3, with drum brushing, climbing ladder, protective screen, platform two, two sides, chimney color brush at the end of one side. 3.2. Construction materials: 3.2.1, paint: Enamel (or chlorosulfonated)

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档