sc200施工升降机基础施工方案(SC200 construction elevator foundation construction scheme).docVIP

sc200施工升降机基础施工方案(SC200 construction elevator foundation construction scheme).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
sc200施工升降机基础施工方案(SC200 construction elevator foundation construction scheme)

sc200施工升降机基础施工方案(SC200 construction elevator foundation construction scheme) Overview of SC200 construction elevator construction scheme of the foundation engineering project overview 1. chapter 1.1, project name 1.2, project overview This project is the name of the building residential area of A1-A7, D1-D7, A exergy shops, supermarkets, comprehensive cultural activity center, The next room in the construction area of 35000 square meters; the construction area of 40016.01 square meters basement the basement on the 2 floor 23 The basement layer height is 6.2M the basement two layer 4.5M the total building height of the 79.3M. 1.3, the project site The project is located in Panyu District Shilou town Chigang village. 1.4, design The maximum height of the whole building is 23 79.00m. This design uses the installation of 2 sets of SC200/200TD construction elevator Respectively for A5-A7 building structure construction. No. 01# to the 02# machine model SC200/200TD. One of the 6-1~6-5 6-G 6-14~6-17 design of shaft section, all of the 6-G axis in the center line are included for construction elevator. The whole construction went up The erection and installation of the lowering machine eventually reached 50m height. 2.SC200/200TD construction lift conditions SC type construction hoist the electrical and mechanical safety system of the main electric components are very reliable imported the original The electric circuit is simple easy operation and maintenance of the low failure rate is the vertical transportation equipment safety, the construction of the university. The construction of the lift drive mechanism with double motor drive and motor drive three to two types of the plug-in can be built at the The user selects each motor is equipped with DC electromagnetic brake and the brake friction pair with automatic tracking and regulating braking gap The function of improving the braking performance of the balanced and reliable. 2.1. model specification S said the symbol C sa

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档