- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
兰大《地基与基础》13春在线作业1(Lanzhou foundation 13 spring online homework 1)
兰大《地基与基础》13春在线作业1(Lanzhou foundation 13 spring online homework 1)
14 spring, 13 autumn, Lan Da, foundation and foundation, 13 spring online homework, 1
Total score: 100 test time: -
Radio examination
A multiple-choice question
Judgment question
Radio examination questions (10 questions, 30 points)
1..
A.
B.
C.
D.
Full marks: 3
2..
A.
B.
C.
D.
Full marks: 3
3..
A.
B.
C.
D.
Full marks: 3
4. often used on weak foundations, the foundation form of frame or bent structure is
Strip foundation under A. column
B. independent infrastructure
C. brick foundation, concrete foundation
Full marks: 3
5..
A.
B.
C.
D.
Full marks: 3
6..
A.
B.
C.
D.
Full marks: 3
7..
A.
B.
C.
D.
Full marks: 3
8. the basis for reducing the additional pressure on the base is () the foundation.
Strip foundation under A. column
Cross Foundation of B. column
C. box foundation
D. raft foundation
Full marks: 3
9..
A.
B.
C.
D.
Full marks: 3
10..
A.
B.
C.
D.
Full marks: 3
14 spring, 13 autumn, Lan Da, foundation and foundation, 13 spring online homework, 1
Total score: 100 test time: -
Radio examination
A multiple-choice question
Judgment question
, (a total of 10 multiple-choice questions, a total of 40 points.)
1., measures to reduce the risk of uneven settlement are
The A. adopts a continuous basis
B. uses piles or other deep foundations
C. for foundation treatment
D. uses enhanced superstructure to accommodate uneven settlement
Full marks: 4
2., liquefaction hazards are mainly
A. sand blasting by water injection
B. foundation failure
C. soil collapse
D. foundation deformation
Full marks: 4
3. setting the settlement joints
A. complex corners of buildings with complex plane shapes
B. building height or load change point
C. types of building structures are different
D. soft and hard junction of foundation soil
Full marks: 4
4., the following assignments have not uploaded the answer, first for everyone to review the use of, if you need to answer the specific see my registration name to find which is the charact
您可能关注的文档
- 人生格言2(Life motto 2).doc
- 人工智能(第八章)(Artificial intelligence (the eighth chapter)).doc
- 人生哲理(Life philosophy).doc
- 人类起源(The origin of mankind).doc
- 人解(One solution).doc
- 人身意外伤害紧急处理(Personal accident emergency treatment).doc
- 人身损害赔偿的具体赔偿项目、法律依据和计算公式(The personal injury compensation for specific projects, the legal basis and the compensation formula).doc
- 人教版初中化学总复习资料(The general review of junior middle school chemistry teaching materials).doc
- 人防设计规范和图集(The civil air defense design specification and Atlas).doc
- 什么叫做平面设计(What is called the plane design).doc
- 兰大《地基与基础》13春在线作业2(Lanzhou foundation 13 spring online homework 2).doc
- 兰大《地基与基础》13春在线作业3(Lanzhou foundation 13 spring online homework 3).doc
- 兰大《工程力学(ii)(材料)》13春在线作业1(Lanzhou Engineering Mechanics (II) (material) 13 spring online homework 1).doc
- 兰大《工程力学(ii)(材料)》13春在线作业2.doc
- 兰大《工程力学》13春在线作业1(Lanzhou Engineering Mechanics 13 spring online homework 1).doc
- 兰大《工程力学》13春在线作业3(Lanzhou Engineering Mechanics 13 spring online homework 3).doc
- 兰大《工程力学(ii)(材料)》13春在线作业3(Lanzhou Engineering Mechanics (II) (material) 13 spring online homework 3).doc
- 兰大《工程结构抗震》13春在线作业3(Lanzhou seismic engineering 13 spring online homework 3).doc
- 兰大《混凝土结构》13春在线作业2(Lanzhou concrete structure 13 spring online homework 2).doc
- 兰大《混凝土结构》13春在线作业3(Lanzhou concrete structure 13 spring online homework 3).doc
文档评论(0)