施工实习个人总结(The construction of personal practice summary).docVIP

施工实习个人总结(The construction of personal practice summary).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工实习个人总结(The construction of personal practice summary)

施工实习个人总结(The construction of personal practice summary) Report from 2010.8.1 company, after a half a month of training, I was assigned to Liubei (formerly North Station Yard) staff residential building project department. During this years probation, through their own efforts and master the guidance of their knowledge into production to achieve the theory and practice, finally grew from a boy to a green hand a qualified socialist successors. The total cost of the project is 53 million 700 thousand, for the frame shear wall structure, including 4#, 5#, 6#, 7# building, four staff residential buildings, and a 2# basement. Among them, 4#, 5# and 7# building are eleven floors, the floor height is 3M, the main building height is 34.3m; the 6# building is fourteen stories, the height is 3M, the main building height is 43.4m. Underground construction area of 7925.3 square meters, construction area of 1718.6 square meters (including air, shelter area of 1270.8 square meters). This project from the excavation of the foundation pit excavation to the construction of the main construction, during which every link I actively participate in, and mastered the technical requirements of all aspects. First, excavation of foundation pit. The first building contour of each turning point out in the field calibration with total station, connect the two turning point and adjacent to the building line, contour line out in the field calibration. According to the calibrated grey line, the excavator is used for earthwork excavation. In this process, the excavation elevation should be controlled. As the excavation of the foundation pit in this project mostly works at night, it brings some difficulties to control the elevation. Because the excavation depth is more than 5m, in order to prevent the collapse of earthwork and eliminate safety hazards other, according to the construction design, in the foundation pit near the west side both residential building, the scheme of anchor soil nailing wal

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档