安徽土建建安成本就多少(人材机)合计(Anhui civil construction cost less (talent total machine)).docVIP

安徽土建建安成本就多少(人材机)合计(Anhui civil construction cost less (talent total machine)).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安徽土建建安成本就多少(人材机)合计(Anhui civil construction cost less (talent total machine))

安徽土建建安成本就多少(人材机)合计(Anhui civil construction cost less (talent total machine)) On issues related to the standard bill of quantities construction project, because the 1 explanation question answering feature description is not accurate enough or changes caused by price changes there should be how to adjust? Answer: project description is not accurate in the bidding stage, the bidders can timely put forward in the bidding and bid before answering in settlement; stage, the contract has an agreement, according to the provisions of the contract; the contract is not agreed, according to the provisions of article 4.0.9 of the code of valuation execution. 2, measures of the project list, a list of other items, sporadic task list items do? Answer: the contract has an agreement, according to the provisions of the contract; the contract is not agreed, according to the provisions of article 4.0.9 of the code of valuation execution. 3, the project cost should be reserved in sporadic work in gold cost? Answer: according to the code of valuation 3.4.1 reserve and sporadic project costs should be separately listed. The cost of odd work items should not be spent on reserve funds. 4, reserve who compiled? Reserve as part of the quotation, bidding and settlement amount is not the same, how to adjust? Answer: according to the code of valuation 2.0.5 reserve shall be considered project for the preparation of the tender. The reserve fund is the amount reserved by the tenderee for the possible change of the quantity of works, and the bidder shall fill in the amount provided by the tenderee when bidding. At the time of settlement, adjustments are made as a result of actual changes. 5, the appendix does not include the reasonable loss of engineering quantity in the calculation rules, whether the bidder should consider it in the quoted price. 6, the bidder in the quotation, the total quoted price should fill in other project fees? Answer: in accordance with the valuation standards 4.0.2 artic

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档