- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安检员(Screeners)
安检员(Screeners)
20. fully mechanized support should be vertical top and bottom plate, the deflection should be less than + 7 degrees. ()
Answer: standard answer: X
22. fully mechanized support should be arranged in a straight line, the deviation of the center distance shall not exceed 100 mm. ()
Candidates answer: standard answer: B.
23. near the location of ground water underground to strengthen support, lay a solid pillar and the board, in case of high pressure water flooding and coal wall support. ()
Candidates answer: standard answer: B.
Two, radio questions (each of the options given only one of the requirements, the option before the letter in the title after the brackets. The big question is 4 minutes, every day 1 points, a total of 4 points)
55. underground electrical machinery room, all kinds of equipment should be between () more than the channel.
A. 0.3 meters, B. 0.5 meters
C. 0.8 meters
Candidates answer: A standard answer: C
67. methane sensors must be hung vertically, and should be no less than (from) the side walls of the roadway.
A. 150 mm B. 200 mm
C. 250 mm
Answer: standard answer: B
72. each coal face must maintain at least one unobstructed safety exit.
A. 1 B. 2
C. 3
Candidates answer: C standard answer: B
74. 、 the mine with high gas rank should adopt () ventilation.
A. draw type B. press in type
C. hybrid
Candidates answer: C standard answer: A
Three, multiple-choice questions (with two or more than two correct answers to each question, the choices given the option before the letters in brackets after the title, a few or more are not a score. The big question is 5 minutes, every day 1 points, a total of 5 points)
87., in dealing with roof fall accidents, the first thing to do is to work safely.
A. strengthen roof observation, B. strengthen the support around the roof fall area
C. check the gas and other harmful gases in the roof fall area. D. organize experienced personnel
Candidates answer: ABD standard answer: ABCD
89., the safety measures of
您可能关注的文档
- 第4章 医药国际贸易产品和质量管理.ppt
- 第18章_耳鼻咽喉、食道和气管异物和颈部疾病——高专高职《五官科学》(第二版)ppt课件.ppt
- 第3章 费米分布和玻耳兹曼分布-zhaowr-2011.ppt
- 第4章 第1讲 钠和其氧化物.ppt
- 第4章 第3讲 铁和其化合物.ppt
- 第4章-药物剂型和制剂应用-2.ppt
- 第4章常用传感器原理和应用4-6.ppt
- 第509A章使用该作业装置人安全和健康六.doc
- 第4章第1节基因突变和应用.ppt
- 第5章 地质作用、年代和第四纪地质.ppt
- 小学科学:ESP8266智能插座电路原理与动手实践研究教学研究课题报告.docx
- 《金融开放浪潮下我国多层次监管体系构建与创新研究》教学研究课题报告.docx
- 区域教育质量监测中人工智能应用的数据质量分析与优化策略教学研究课题报告.docx
- 《金融科技监管中的数据治理与合规性要求》教学研究课题报告.docx
- 《3D打印技术在航空航天领域中的多材料制造与复合材料应用》教学研究课题报告.docx
- 《绿色金融发展中的政府职能与市场机制研究》教学研究课题报告.docx
- 《植物工厂多层立体栽培光环境调控技术对植物生长发育节律的调控机制探讨》教学研究课题报告.docx
- 销售团队年度业绩总结.docx
- 银行风险管理与金融危机防范.docx
- 银行网络攻击预警与快速响应机制.docx
文档评论(0)