- 1、本文档共35页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
发放的负担(The burden of payment)
发放的负担(The burden of payment)
Journal
Bar map entry 2011.6.27 reading (725) a reinforced knowledge | diary praise praise (6) (6) (6) praise praise (6) (19) has been successfully reproduced share comments (11) copy the address more
I. method of stirrups:
The diameter of 10@100/200 (2) said the stirrup is 10, 100 non encrypted encryption area space, area distance of 200, all double hoop.
The diameter of 10@100/200 (4) said the stirrup is 10, 100 non encrypted encryption area space, area distance of 200, all limbs hoop.
The diameter of 8@200 (2) said the stirrup is 8, double hoop spacing is 200.
The diameter of 8@100 (4) /150 (2) said the stirrup is 8, the encryption interval of 100 limbs hoop, non encrypted area spacing 150, double hoop.
First, the main beam on the beam and the main beam under the beam at the same time that the method:
The 3 Phi 22, Phi 20 3 3 22 with said upper bar, lower reinforced 3 phi 20.
The 2 Phi 12, Phi 18 3 2 12 said the upper bar, lower reinforced 3 phi 18.
The 4 Phi 25, Phi 25 4 4 25 with said upper bar, lower reinforced 4 phi 25.
The 3 Phi 25, Phi 25 5 3 25 with said upper bar, lower reinforced 5 phi 25.
Two. The method of reinforcing steel bar on the top of beam: (on the beam support)
The 2 said the two Phi 20 Phi 20 steel, a long pass arrangement for double hoop.
The 2 22+ (4 Phi Phi 12) said 2 to 4 with a diameter of 22 mm long, with 12 erect steel hoop for six.
The 6 Phi 25 4/2 said 4 reinforced the upper upper row of 2 Phi 25, Phi 25.
The 2 phi 22+ Phi 22 2 said only one row of steel bars, two in the corner, two in the middle, uniform layout.
Three, Liang Yaozhong steel reinforcement method:
The G2 said the structure of reinforced beam with 12 sides, each side of a diameter of 12.
The G4 said the structure of phi 14 reinforced beams on both sides, each side two phi 14.
The N2 said on both sides of the beam diameter of 22 torsion bars, each side of a diameter of 22.
The N4 said on both sides of the beam diameter of 18 torsion bars, each
您可能关注的文档
- 第一单元氯、溴、碘和其化合物第二节氯气性质.ppt
- 第一章 软件工程现状和发展.ppt
- 第一节 传染病和其预防 第二节 免疫与计划免疫导学案.doc
- 第一章 计算声学中数值计算和误差分析1.ppt
- 第七章 蛋白质降解和氨基酸代谢.ppt
- 第七章 氧化还原习题和答案.doc
- 第一阶段 专题六 分子动理论 气体和热力学定律.ppt
- 第七节.神经系统疾病常用诊疗技术和护理—四.高压氧舱治疗.doc
- 第三章 五官和颈部.doc
- 第一讲水工业和其学科建设1.ppt
- 2025至2030中国IPTV行业市场占有率及投资前景评估规划报告.docx
- 吉林省长春市“三支一扶”招聘考试模拟题《行政职业能力测验》含答案.docx
- 夏至现象的科学探索.pptx
- 现代商业企业管理课件.pptx
- 山东省枣庄市第八中学2024-2025学年高一下学期5月阶段性学情诊断数学试题B.docx
- 2025年风险总监面试试题及答案.doc
- 2025至2030中国iPadPOSSoftware行业市场占有率及投资前景评估规划报告.docx
- 2025至2030中国IPL(强脉冲光)脱毛行业项目调研及市场前景预测评估报告.docx
- 竞赛教育中心活动在数学计算学习使.pdf
- 现代商务楼物业管理.pptx
文档评论(0)