- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
场地作图(Site map)
场地作图(Site map)
The following questions are discussed in detail according to the order and type of questions in recent years:
3. site analysis, examination attention
First in the last 10 years of site analysis, examination questions, one to draw attention to the exam. Poor writing skills, once only, if can realize, I want to.
Site analysis, annual examination. Its not difficult, but thoughtful.
Planning retreat line, execution first. Sunshine retreat side, and other wipe round.
Analyze carefully to prevent leakage. Dont throw away the corner blocks.
The scope of theory is not reality. Other specifications, and unrelated.
Fire spacing, standard discernment. Non residential, non high 24.
General public construction, shielding without obstruction. Living room to ensure sunshine.
Lower business, without sunshine. Base elevation difference, when ruled out.
Automobile export, safety angle of view. Classroom construction needs noise prevention.
Heres a simple explanation.
The year compulsory site analysis, and relatively simple, when thoughtful, not in this era. Problem solving, first of all, according to the requirements of the subject draw planning retreat line, and then consider fire prevention, sunshine, sanitation protection, cultural relics protection and other distance requirements. It should be noted here already agreed rules, sunshine distance is calculated according to the distance coefficient given, exit is the shape of a building to shelter the north wall for the bottom edge of the rectangle. While other factors affect the scope of the building, in the corner of the flat figure, 1/4 circle must be made. Sometimes we should also consider the influence of the water in the middle or near the ground, the ancient city wall and the high pressure corridor. The topic will be given back distance and done as required.
We should also draw attention to the fact that the maximum scope of construction is only the theoretical analysis of the scope of land use. It does not need
您可能关注的文档
- 各种反应堆的原理(The principle of various reactors).doc
- 叶公的族系(Ye clan).doc
- 各种体积面积求解及换算(A variety of volume and area calculation and conversion).doc
- 各种器件品牌(Various devices brand).doc
- 各种场所国家规定的标准照度列表(Illumination standard list of various places as prescribed by the state).doc
- 各种宗教禁忌(All kinds of religious taboos).doc
- 各种混凝土的养护时间 - 行于天下的日志 - 网易博客(The curing time of concrete - all in the world of the log - NetEase blog).doc
- 各种地基处理方法,要详细的(Various ground treatment methods, should be detailed).doc
- 各种电平标准的讨论(Discuss the various level standard).doc
- 各种电阻阻值表(全)(All resistance table (all)).doc
最近下载
- 小学科学人教鄂教版六年级下册第一单元《生物与环境》教案(2023春.pdf VIP
- 人教鄂教版科学六年级下册第一单元生物与环境单元教案.pdf VIP
- 一例高血压患者的护理个案.docx VIP
- 青岛版六年级下册科学《生物与环境》大单元教学方案与反思.docx VIP
- 甘肃《建筑抗震加固工程消耗量定额》.pdf
- 高中英语1.5万考点.pptx VIP
- 新人教鄂教版六年级下册科学第一单元《生物与环境》全单元课件.pptx VIP
- CFMOTO春风动力450SR S CF400-9(6AQV-380101-3000-11 CN233)摩托车使用手册.pdf
- 水电站砂石系统施工组织设计(221页).docx VIP
- 2024新人教版初中英语七年级下册重点知识点归纳(复习必背).pdf VIP
文档评论(0)