- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
对空调控制系统ba的认识(Understanding of air conditioning control system ba)
对空调控制系统ba的认识(Understanding of air conditioning control system ba)
Architectural Design Institute of Zhejiang province Sun Tao
Abstract: This paper discusses some technical aspects of the implementation of BA control of HVAC system, air conditioning and ventilation system enables the BA system to better serve the controlled, try to make two in technology closely integrated into an inseparable electromechanical system. This paper has obtained some preliminary conclusions.
Keywords: air conditioning and ventilation building automation
An introduction.
The twenty-first Century is the era of information has come to network communication and computer technology as the background of intelligent building is the inevitable trend to conform to the trend of the times. As one of the 3A building automation system of intelligent building system (BAS) monitoring and centralized management of the building of the hydropower HVAC electromechanical equipment has become essential in modern architecture configuration. According to preliminary statistics, the building automation system adopted in our hospital is now designing public construction projects in more than half. A few years ago, the growth momentum is very strong.
The implementation of energy saving and management benefits BAS can bring is known, and the owners in the implementation of this system tend to have high expectations. However, from a number of completed projects, and did not reach the expected effect, especially in the following two aspects [1]:
A) the opening rate at the end from the industry estimates, no more than 20%.
B) BAS system has been opened, the majority only realize the automatic start and stop monitoring of construction equipment, the energy saving is mainly manifested in some of the equipment the timing of opening and closing, as the key of building energy consumption of air conditioning system, how to optimize the operation, according to the actual system as far as possible energy saving economic oper
您可能关注的文档
- 图像文件的后缀名(Image file name suffix).doc
- 图像几何校正(Image geometric correction).doc
- 图书馆管理-信息时代图书馆资源建设构想(The library management information age library resources construction).doc
- 图像特征特点及常用的特征提取与匹配方法(Methods of feature extraction and image matching features and common features).doc
- 图像转换程序(Image conversion program).doc
- 国标阀门常用材料及匹配(The commonly used materials and matching valve GB).doc
- 图像分割介绍(Image segmentation is introduced).doc
- 图形与位置的备课与教学 - 绍兴市教科研网(The preparation and teaching pattern and the position of Shaoxing city education and Research Network).doc
- 图形的api说明(Figure API shows).doc
- 图标单击右键以后没有打开选项啊(Right click the icon after no open option).doc
最近下载
- 一种钢铁综合废水浓盐水的减量化、资源化处理组合方法与系统.pdf VIP
- 《碳中和管理体系 要求》(征求意见稿).pdf
- 医院银行存款管理制度.docx VIP
- 新北师大版数学五年级上册第六单元“组合图形面积”单元试卷 .pdf VIP
- 人教版高中英语必修一全册教学课件.pptx
- 《工逆向工程与增材制造》课件——17. Geomagic Design X 草图建模方法 .pptx VIP
- 海姆立克急救法-(精).ppt VIP
- 北师大版九年级下册数学全册同步练习.docx VIP
- 2025全国青少年模拟飞行考核理论知识题库40题及参考答案1套.docx VIP
- 在线网课学习课堂《兵棋(中国人民武装警察部队警官学院)》单元测试考核答案.docx VIP
文档评论(0)