- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
独家策划s2线牵手沪轨交 苏州轨交面面观(Exclusive S2 Shanghai rail line in Suzhou rail surface view)
独家策划s2线牵手沪轨交 苏州轨交面面观(Exclusive S2 Shanghai rail line in Suzhou rail surface view)
Exclusive: S2 Shanghai rail line in Suzhou rail surface view
Time: 2013-11-22 10:06:00 source: City News: [small] font
Because of you wonderful Suzhou City hiring
Review: Suzhou has entered a period of rapid development of city rail transit. According to the new city rail transit network planning, is expected to 2030, Suzhou will build 9 rail lines, the total length of 405 km.
To speed up the city rail transit network planning and construction at the same time, the long-term will be the construction of 6 city rail line, and realize efficient interconnection between the county-level city and district. Suzhou industrial park planning publicity started before the day (2012-2030), the 6 city line in the S1 line, S2 line after the park, the basic direction ahead of the appearance, is the East-West route, the rapid communication of high tech Zone, Suzhou City, S1 line area, Suzhou Industrial Park Kunshan, Taicang and Taicang city; S2 line channel on the south side of things to strengthen the Shanghai Nanjing, Shanghai Nanjing intercity West Park Station, East Kunshan huaqiao.
Now is the normal operation of the Metro Line 1, line 2 will run in the next month, today the city planning, bring you a detailed understanding of Suzhou rail transit construction.
Suzhou rail built 1, 2, 3, 4 lines plan 12th Five-Year period
According to the plan, 1, 2, 3, line 4 is needed in the 12th Five-Year (2011 -2015 years) during the period of completion, at present, also under construction is the 2 line extension line, rail line 4 and line two, this line will be held in 2016, opened in 2017, 3 rail the line has completed the preliminary design review. In 2007 1 and 2009 2 line line started construction, and according to the overall planning of the City Planning Bureau of the 07 edition of the compilation, the construction of rail transit planning in the second round, to 2015 years.
Suzhou rail transportation 1,
您可能关注的文档
- 李孔岳建设与环境、企业培训战略相匹配的企业文化(Li Kongyue Construction and the environment, enterprise training strategy match the enterprise culture).doc
- 李开复观点摘要(The views of Li Kaifu).doc
- 李明和让自然美变年企业培训轻(Li Ming and let the natural beauty change enterprise training light).doc
- 李明和让自然美变年轻管理(Li Ming and let the natural beauty of young management).doc
- 李清照《词论》评析(The word of Li Qingzhao).doc
- 李伟明十大速算技巧(公务员)(Li Weiming ten quick tips (civil servants)).doc
- 李委明十大速算技巧(完整版)(Li Weiming ten quick tips (full version)).doc
- 李白诗集讲解(On the poems of Li Bai).doc
- 材料力学例题及(The mechanics of materials and examples).doc
- 材料科学与工程学导论3(An introduction to materials science and Engineering 3).doc
最近下载
- Siebel TAS销售管理方法论交流.ppt
- 一种耐高温热轧H型钢及其生产方法.pdf VIP
- 2025协同办公领域AI发展与应用实践报告.pptx VIP
- 2025年中电建电力运维管理有限公司招聘笔试参考题库含答案解析.pdf
- 2024中电建电力运维管理有限公司招聘361人笔试参考题库附带答案详解 .docx
- 一例高血压患者的护理个案.docx VIP
- 2025年高考语文课内文言文知识梳理(统编版)专题04《登泰山记》(解析版).docx VIP
- 2025年新高考语文专题复习:小说情节知识点讲解 课件139张.pptx VIP
- AI大模型产业落地场景和价值.pdf VIP
- 彩钢板屋面拆除、更换屋面板施工方案.docx VIP
文档评论(0)