建筑施工全标准化工作实施方案.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑施工全标准化工作实施方案

开展安全质量标准化工作 实 施 方 案 湖南柏诚建设有限责任公司 二O一三年九月 柏诚建设有限责任公司 开展安全质量标准化工作实施方案 为了贯彻落实国家和省住建厅关于开展建筑施工安全质量标准化工作的有关意见,推动我公司建筑施工安全生产水平稳步提高,促进我公司可持续发展,结合我公司实际,制定本实施方案。 ?一、工作指导思想 深入贯彻实施《安全生产法》、《湖南省建设工程质量和安全生产管理条例》、《施工企业安全生产评价标准》(JGJ/T77-2010)湖南省建筑施工安全重大危险源识别和控制管理暂行办法[2006] 湖南柏诚建设有限责任公司 of vision. 3, build, fitting in with the urban master plan in Yibin city rapid rail transit long term network, as well as the vision of Yibin city, and future development of rail transit network. 4, Yibin city, preliminary rail traffic levels service levels, system model, and technical standards. 5, to ensure that network can be implemented. 6, stable conditions for planning and supporting of Yibin city track traffic construction and formation of rail transit industry, provide conditions for the start-up and development of rail transit in Yibin city. 1.7 technical course technology is the projects research program and research ideas. Technology reflects the various stages in the process, logical relations between various levels, research, techniques and phases. Network planning process the whole process can be divided into four parts, namely, background research, network architecture research, planning and implementation of research and programming interfaces. Figure 1.7-1 Yibin city rail transit network planning technology roadmap planning interface is mainly responsible for network planning interface with follow-up planning tasks. Network planning Urban planning system in a transitional position, online network planning is completed, will be carried out as soon as possible the following planning projects: 1, detailed control of the land of rapid rail transit network planning; 2, the partitioning for network planning; 3, joint planning of rail transport and urban transport in other ways; Detailed technical courses see below. Figure 1.7-2 General technology route figure 2nd chapter City status and development planning 2.1 city basic profile 2.1.1 o

文档评论(0)

1444168621 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档