37综合测试题(37 comprehensive test questions).docVIP

37综合测试题(37 comprehensive test questions).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
37综合测试题(37 comprehensive test questions)

37综合测试题(37 comprehensive test questions) Site and architectural design (two) class thirty-seventh (online courseware handouts about global occupation education) Site and architectural design (two) class thirty-seventh Lecture Notes 1-10 The 1 relates to the land and land in the city land development concept, which of the following statements is true (A). A. has seven level cultivated land B. prepared -- has made construction land planning permit land C. prepared -- has made construction project planning permit land D. - has been developed but has not yet completed the land Hint: uncompleted land has been the main non life. Rehmannia, effective certificate, project planning permits, seven in one, can be started, so the A is prepared. 2 which of the following is a violation of the construction law (C). A. professional and technical personnel engaged in construction activities, shall obtain the corresponding qualification certificate according to law, and engage in construction activities in the scope of the implementation of the qualification certificate within the permitted B. architectural design units selected in the design of the building materials, construction parts of the equipment shall not designate manufacturers and suppliers Responsible for the engineering design of C. modified by the original design and construction units The survey and design unit of D. construction project shall be responsible for the survey and design quality Tip: to modify the engineering design by the design unit, construction enterprises shall not alter the design of projects without authorization. 3 project proposal stage investment estimation error is allowed (D). A.5% B.10% C.15% D.20% Note: the construction procedure of the construction project feasibility study and project proposals in the second chapter focus on the depth of the project proposal pointed out that investment estimation error of 20% allowed. The 4 of a unit of a residential building, the city water supply pipe net

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档