zl3f011-2009创优工程管理办法(2009第一版)(Zl3f011-2009 excellent project management approach (2009 Edition)).docVIP
- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
zl3f011-2009创优工程管理办法(2009第一版)(Zl3f011-2009 excellent project management approach (2009 Edition))
zl3f011-2009创优工程管理办法(2009第一版)(Zl3f011-2009 excellent project management approach (2009 Edition))
This paper contributed by weixq8.
Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view.
The first edition of the first edition in 2008 2009
2009-03-01 2008-02-01 2009-03-01
The abolition of execution
Liu Li Liu Li
Liang Binghai Liang Binghai
Song Yuwen Song Yuwen
Amendment
Revision
Effective date
Expiry date
state
To write
To examine
Approval
Modify the instructions
The construction of Tianjin electric power company standard
ZL3F011-2009 instead of ZL3F0011-2008
Quality management professional file excellence project management approach (2009 Edition)
This document is the property belonging to the Tianjin electric power construction company, without the written permission of the company, the property of this document belongs to the Tianjin electric power construction company, without the written permission of the company, no one is allowed to use, copy, transfer or disclosure of the document. Unauthorized use, copy, transfer or disclosure of the document
Change records
The effective date of the page
Text 112
chapter
Throughout
Modify the content and basis
Quality supervision department was renamed quality management, the relevant departments to replace the name now unified name. 2.5 China power quality project selection method (2008 Edition) 3.1.2 as the companys excellence planning project department should formulate the project excellence planning, detailed planning work do a work
The first edition of 2008-02-01 2008
The first edition of 2009-03-01 2009
Two
The range of 1
Three
1, applicable scope is: this document applies to domestic contract within the scope of the various types of power engineering construction, installation, commissioning, industrial and civil engineering structures and high-rise project, power transmission line and substation engineering, pressure pipeline project
您可能关注的文档
- usb充电器套件(USB Charger Kit).doc
- usb的结构及工作原理(The structure and working principle of USB).doc
- unix下c语言的图形编程curses.h函式库(UNIX graphic programming under C curses.h function library).doc
- u盘修复2(U disk repair 2).doc
- u盘做背景(Do u disk background).doc
- u盘加密加速两不误(U disk encryption acceleration two.).doc
- u盘图标制作(U disk icon making).doc
- u盘修理(U disk repair).doc
- u盘自定义图标(U disk custom icon).doc
- u盘被写保护的万能解锁方法(U disk write protected universal unlock method).doc
- 浙江衢州市卫生健康委员会衢州市直公立医院高层次紧缺人才招聘11人笔试模拟试题参考答案详解.docx
- 浙江温州泰顺县退役军人事务局招聘编外工作人员笔试备考题库及参考答案详解一套.docx
- 江苏靖江市数据局公开招聘编外工作人员笔试模拟试题及参考答案详解.docx
- 广东茂名市公安局电白分局招聘警务辅助人员40人笔试模拟试题带答案详解.docx
- 江苏盐城市大丰区住房和城乡建设局招聘劳务派遣工作人员4人笔试模拟试题带答案详解.docx
- 浙江舟山岱山县东沙镇人民政府招聘笔试模拟试题及参考答案详解1套.docx
- 最高人民检察院直属事业单位2025年度公开招聘工作人员笔试模拟试题含答案详解.docx
- 浙江金华市委宣传部、中共金华市委网信办所属事业单位选调工作人员笔试备考题库及答案详解1套.docx
- 广东深圳市党建组织员招聘40人笔试模拟试题及答案详解1套.docx
- 江苏南京水利科学研究院招聘非在编工作人员4人笔试模拟试题及参考答案详解.docx
文档评论(0)