- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桩问题处理(Pile problem treatment)
桩问题处理(Pile problem treatment)
Collapse
The frequency of collapse accident is relatively high during construction, and the main reasons are:
1., the proportion of mud is not enough and other performance indicators do not meet the requirements, so that the hole wall did not form a solid mud skin.
2., not timely water, and hole pressure drop.
3. tube bottom wall building, no wellhead vibration, wellhead collapse.
4. in the loose sand in the drilling footage is too fast.
Treatment method:
1., when the hole collapse, can immediately remove the protective cylinder, and backfill drilling, re buried protective cylinder, and then drilling.
The 2. hole collapse, ascertain the collapse location, backfill sand and clay mixture to collapse more than 1 ~ 2 meters, such as serious hole collapse should be backfilled, to backfill compacting deposition after drilling.
Two, drilling deviation or tilt
Main cause:
1. in the event of a large boulder drilling probe or stone.
2., in the inclined soft and hard strata boundary, along the rock slope angle drilling; or from the size of the sand and gravel layer of drilling, the drill bit force uneven.
3. the rig and the drill stand are not balanced by themselves.
Treatment method:
1. to find out the location and the situation of the deviation of the drill hole, and generally sweep the hole repeatedly in the deflection so as to make the drilling upright. When the deviation is serious, the sand and clay should be backfilled to the inclined place, and the drilling shall be continued after the deposit has been compacted. The impact of drilling, should be backfilled sand gravel and clay to be deposited dense after drilling, when the hole deflection correction is not serious, at the beginning of deviation set a small amount of explosives (less than 1 kg) and then blasting, sand and gravel backfill to the position above about 1m, re drill.
2. when the judge to tilt the tilt of the soft and hard strata, is flat after drilling at rubble backfill.
Examp
您可能关注的文档
- 张学友历年专辑(Jacky Cheung albums).doc
- 张家港车辆年检指南(Guidelines for annual inspection of vehicles in Zhangjiagang).doc
- 张家界旅游攻略景点介绍(Zhangjiajie introduction to tourist attractions).doc
- 引用 各种单位换算方法与公式(借)(Refer to various unit conversion methods and formulas (borrow)).doc
- 引用内存不能为read的问题(Reference memory cannot be a read problem).doc
- 张家界自助游路线攻略大全(Zhangjiajie self-help travel route Raiders).doc
- 张家界袁家界旅游导游词(Tour guide of yuan family in Zhangjiajie).doc
- 张忠谋台积电不管理会跟进富士康加薪(Zhang Zhongmou TSMC does not manage to follow Foxconn's pay increase).doc
- 张澜故里景区环线桥梁道路建设工程融资建设招商公告(第二次)(Announcement on investment in construction of road link bridge and road construction in Zhang Lan hometown (second times)).doc
- 张爱玲经典语录50句(Eileen Chang classical quotations 50 sentences).doc
- 殷保华工作线法则(Yin Baohua's work line rule).doc
- 永不过时的冬季护肤守则(Timeless winter skin codes).doc
- 永大日立电脑操作(Yongda Hitachi computer operating).doc
- 永明体(yongming-style).doc
- 永登县基层党员干部培训工作情况汇报_干部教育_干部人才建设_永登党建(Yongdeng County grassroots cadres training work report _ cadre education _ talent construction _ Yongdeng Party cadres).doc
- 油井计量技术现状及其发展方向(Present situation and development trend of oil well metering technology).doc
- 正确洗澡常识(Proper bath tips).doc
- 油价调整为我国cpi减压 对资本市场影响深远(Oil price adjustment for China's CPI decompression, far-reaching impact on the capital market).doc
- 油发(Hair oil).doc
- 油建一公司锅炉安装队先进事迹(A construction company boiler installation team advanced deeds).doc
文档评论(0)