电机试验工操作规程(Code of practice for motor testing).docVIP

电机试验工操作规程(Code of practice for motor testing).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电机试验工操作规程(Code of practice for motor testing)

电机试验工操作规程(Code of practice for motor testing) Code of practice for safety technical operation of electrical test workers (1) site safety operation regulation; 1., before work to clear the tasks and safety regulations. 2. the tools used must comply with safety requirements. 3. test power supply must understand voltage and measure if necessary. 4. the power supply for the test and repair work must be equipped with switches and insurance. No power supply with load. 5. all test work, the electrical equipment metal housing must be reliable grounding. 6. test power supply, such as the ground phase voltage, should be separated from the ground wire and FireWire, when the test product is grounded, the power must be connected to the ground end of the tested products at the ground end. 7., when the test, to do one person wiring, two inspection, ultra high voltage test to two operators, after confirmation of the error, and then officially electrify. 8. low voltage live test work should be insulated gloves and goggles, work should wear long sleeved clothes, the main test stand on a reliable insulation, the use of insulated handle tools, and a special person responsible for guardianship. 9. before the test, the nameplate data shall be recorded, the test shall be carried out according to the regulations, and the test records shall be made. 10. electrical equipment that rises from zero to adjust voltage shall be checked before use and pushed back to zero. 11., work to concentrate, abnormal situation, calm down and find out the reason. Disconnect the stack manually when necessary. 12., the capacitor and large inductance equipment before and after high voltage test, should be fully discharged, discharge insulation gloves should be worn. 13. DC motor overspeed test, to install shield to prevent injury. 14. measuring insulation work must disconnect all the power supply of the electrical equipment and reliably grounding. When the ground wire is removed due to work, the following regulat

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档