二建施工管理(试题1)(Erjian construction management (item 1)).docVIP

二建施工管理(试题1)(Erjian construction management (item 1)).doc

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
二建施工管理(试题1)(Erjian construction management (item 1))

二建施工管理(试题1)(Erjian construction management (item 1)) 1, the construction unit forced the contractor to bid at below cost price, should be imposed () fine. A.20 million or less B.20 million or less, less than 500 thousand C. project contract amount of 5 per thousand D. project contract amount of 10 per thousand 2. The elements of a trademark do not include (). The name of the A. trademark B. logo design C. trademark color Scope of use of D. trademarks 3, the following contract, which belongs to the contract, is (). A. contract of sale B. loan contract C. guarantee contract D. contract of undertaking 4, a and B signed a housing sale contract, a has paid half of the 1629, at this time a request B delivery housing and transfer procedures, and then pay the other half of the house. The following statement is correct (). A. in accordance with the principle of good faith, B shall not exercise the right of concurrent defense B. B has the right to exercise concurrent defense C. a breach of contract prior to, B has the right to terminate the contract D. B has to exercise an uneasy right of Defense 5, according to the law of China, the following is not a condition of the winning bid is (). A. can satisfy the comprehensive evaluation standards stipulated in the bidding documents to the maximum extent B. meets the substantive requirements of the tender documents C. tender price below cost D. tender lowest price 6, in the following cases, the production safety requirements of production and operation units are not required; (). A. production and operation units put in a large amount of funds for safe production facilities B. set up safety management institutions to manage the storage and operation of dangerous articles C. is equipped with labor protective equipment D. personal injury insurance shall be paid by individual employees 7, the contract letting unit will give the project to the contractor who does not have the corresponding qualification, how will it be handled? A. order

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档