- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
责任风险和风险评估管理 高速公路项目
LIABILITY TERMINOLOGY Liability Terminology in This Presentation Liability: Contractor’s responsibility for damages caused by actions done by Client, third parties, or nature. So we are not talking about contractor’s contractual responsibilities for project execution. But we are talking about situations where Contractor is called to be liable while he should not be. Liability Risk: Probable and potential situations (events) leading to Contractor’s liability Liability Exposure: Amount of loss caused to Contractor due to a liability (situation) Liability Risk Management Define Contract limits (all parties’ responsibilities and rights) Minimize Contractor’s liability risks (delays, disruptions, prolongations, and additional costs) Reduce Contractor’s liability exposure (late completion and additional costs) Claim for Extension Of Time (EOT) and Additional Costs Dispute Client claims Dispute sub-contractors claims File insurance claims Project RisksClient and Contractor Completion Risk Delay in completion Delay in Client revenue operation Project cost overrun in completion Financing Risk Revenue Risk Political Risk Force Majeure Risk Partnering Risk RISKS DUE TOPROJECT SCOPE and PROJECT MANAGEMENT Project Execution Arrangement Client Management The Client Management DPN is a newly formed organization within the Ministry of Public Works. DPN has no design-build management experience and practice for major transportation projects. Beside Governmental and Political obligations, DPN has no other incentive. 3 R’s of Design-Build Projects Risks Responsibilities Relationships Design-Build ProjectsRisk-Sharing Design-Build ProjectsResponsibilities Design coordination Constructability reviews Design QC/QA Construction QC/QA Design services during construction Defects correction after construction Design-Build ProjectsRelationships Contract Co-Location of Contractor/Designer/Client Client/Contractor Contractor/Designer Partnering CONTRACT LIABILITY LIMITS(Main Items) G
原创力文档


文档评论(0)