欧盟压力测试同行审查初步问题PreliminaryQuestions-台电公司回覆.DOC

欧盟压力测试同行审查初步问题PreliminaryQuestions-台电公司回覆.DOC

  1. 1、本文档共36页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
欧盟压力测试同行审查初步问题PreliminaryQuestions-台电公司回覆

AEC Response to Preliminary Questions TOPIC-1a Questions and Responses Chapter 2.1.3.3 Chinshan: If there are deviations the station shall follow relevant procedures to carry out safety evaluation and take corrective actions: a) Do the other sites have the same requirements? b) How often since the Fukushima-Daiichi accident cases of non-conformance have been reported to AEC? c) Are non-conformance information processes with information of AEC also in force for other aspects of nuclear safety and were they laid down (e.g. operation manual)? d) And for which plants? (a) Yes, all the nuclear power plants follow the same requirements. (b) There has one non-conformance case, regarding the unprotected ECW system from the specified tsunami run-up height, been reported to AEC by KSNPP, since the Fukushima-Daiichi accident. (c). Yes, it is carried out in accordance with SOP 1115.01 (The control procedure for the case which does not meet the quality requirement.), all the non-conformance information will be submitted to the AEC in all aspects. (d). All NPPs are required to follow. The plant condition for the evaluation of plant robustness regarding external hazards shall be examined on the most unfavourable operation state permitted under plant specification. The country file doesn’t provide information on shutdown states and doesn’t provide information regarding spent fuel pool safety. Will the analysis be completed? 1. Spent fuel pool is designed to SSE. 2. R/B overhead cranes in CSNPP and LMNPP and fuel building overhead crane in KSNPP are designed as single-failure-proof crane, and normally parked at the place far away from the upper space of the fuel storage pool and the reactor core. 3. Refueling platform is made of seismic class I structure. Under the normal condition, this platform is parked on the lower floor region which is located in between the fuel pool and the reactor core, with the rails of the supporting structure of the said plat

文档评论(0)

fengruiling + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档