- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
储能系统宣传(eng)()
Eco- Friendly, Longer Life, More Reliable
Content
1、System Introduction 1
2、Main Features 1
3、Applicable Circumstances 5
4、System Specification 6
1、System Introduction
The system is applied in residential power storage, which can be powered by roof PV system and small family wind turbine, and also the power storage unit can store the low cost power from the utility grid so as to use this power during peak time. This system can not only be used as emergency power but also can reduce the cost of the conventional power. Besides family use, this system is applied to the circumstances of field operations, emergency power failure, common home appliances, lighting and communication equipments.
System Configuration
2、Main Features
Easy to connect
In commercial and residential power system,Lithium-ion energy storage system consists of controller, inverter unit, lithium-ion battery and lithium-ion battery management system. The system has a PV input which is used to connect PV modules. The grid input can be pluged with normal plug. The system has 6 sockets to provide power for the loads. Easy to use.
Monitoring Panel
The monitoring panel displays working status which includes battery capacity, working time, load statues, charging and discharging and etc. Easy to read.
Timing function
Humanized design allows customers to set the non-peak time, which makes it store power from the grid at night and use during peak time at day time. Reduce power cost, eco-friendly.
Movable
The system case has wheels at the bottom,easy to move.
System working mode
AC(Grid) Priority (PV Back-up)
When AC (grid) and PV (photovoltaic) power are both available, the system will take grid power as first priority, and then through a voltage stablitily component to stable the voltage to provide power for the loads. The PV only works to charge the battery.
PV(Photovoltaic)Priority,(AC Back-up)
When AC (grid) and PV (photovoltaic) power are both available,system PV takes PV (Photovol
您可能关注的文档
- 今别离(其一)[].ppt
- 【课堂新坐标】学高一语文同步课件罗曼·罗兰(选).ppt
- 一中国的地方文化特色.ppt
- 一中国家具文.ppt
- 从百草园到味书屋().ppt
- 一中国国防课件全.ppt
- 他赋予陶泥以生命的活力——记青陶艺家汉方(拟送市文艺评论家协会)).doc
- 从中科院走向成就v.ppt
- 任弼时中学周练卷.doc
- 任丘地区继续考试.doc
- 浙江衢州市卫生健康委员会衢州市直公立医院高层次紧缺人才招聘11人笔试模拟试题参考答案详解.docx
- 浙江温州泰顺县退役军人事务局招聘编外工作人员笔试备考题库及参考答案详解一套.docx
- 江苏靖江市数据局公开招聘编外工作人员笔试模拟试题及参考答案详解.docx
- 广东茂名市公安局电白分局招聘警务辅助人员40人笔试模拟试题带答案详解.docx
- 江苏盐城市大丰区住房和城乡建设局招聘劳务派遣工作人员4人笔试模拟试题带答案详解.docx
- 浙江舟山岱山县东沙镇人民政府招聘笔试模拟试题及参考答案详解1套.docx
- 最高人民检察院直属事业单位2025年度公开招聘工作人员笔试模拟试题含答案详解.docx
- 浙江金华市委宣传部、中共金华市委网信办所属事业单位选调工作人员笔试备考题库及答案详解1套.docx
- 广东深圳市党建组织员招聘40人笔试模拟试题及答案详解1套.docx
- 江苏南京水利科学研究院招聘非在编工作人员4人笔试模拟试题及参考答案详解.docx
文档评论(0)