- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
New template instructions - Joint Office of Gas Transporters 新的模板指令-天然气运输联合办公室.ppt
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. August 23rd 2011 Flow Swap Scenarios – Agreed Logic Background The Review Group 0316 report concluded that: “National Grid NTS raised Modification 0365 (National Grid NTS Initiated Flow Swaps) to clarify the UNC with respect to flow swaps. However, it was not clear that this modification is necessary and a set of scenarios was developed with a view to clarifying the application of the UNC under a range of circumstances involving flow swaps. These scenarios have not yet been agreed by the DNs and National Grid NTS. Once final, agreed, scenarios have been established, they will be published alongside this Report” Background cntd The logic and scenarios referred to within the review group report have now been finalised and agreed between National Grid NTS and the DNs. Agreement has been reached by the review group that this logic is consistent with the UNC rules and as such will be utilised by National Grid NTS to calculate the NTS Exit (Flat) Overrun Quantity when a flow swap has occurred. UNC Modification 0365 – “National Grid NTS initiated flow swaps” has now been withdrawn as a result of this agreement. The logic, principles and scenarios agreed to are included within this slide pack and to be published alongside the 0316 Review Group Report for reference. Key Drivers for Flow Swap Scenarios The key principles driving the logic for an NTS Exit (Flat) Overrun adjustment (via a NTS Exit (Flat) Capacity transfer(s)) as a result of a flow swap - The NTS Exit (Flat) Overrun quantity at the specific NTS/LDZ Offtakes will not increase as a result of any NTS (Exit) Flat Capacity Transfer between these specific NTS/LDZ Offtakes. The aggregate NTS (Exit) Flat Capacity position across these specific NTS/LDZ Offtakes remains unchanged. The NTS Exit (Flat) Capacity transfer quantity must be consistent with the agre
您可能关注的文档
- 木材干燥学 第四章 干燥过程热质传递.ppt
- 2012《金版新学案》高三一轮(安徽专版)物理:第7章 恒定电流 章末大盘点 精品课件.ppt
- 利润分配【内部精华】.ppt
- 全国公共英语四级考试辅导2[突破英语等级考试].ppt
- 医疗行业运维审计方案[企业审计管理推荐].ppt
- 2012届高三地理复习课件(安徽用)区域地理第2章第2节__中国的自然环境与自然资源2.ppt
- 高中生物 葡萄的激素课件 新人教版.ppt
- COMPOUNDS AND BONDING - William Fremd High School 化合物和粘结-威廉来到学校.ppt
- 【物流精选】企业资源计划与供应链管理.ppt
- 系统工程导论(梁军)第三章 社会经济系统及其复杂性_图文.ppt
文档评论(0)