Bike Trail Operations and Maintenance单车径的操作与维护.ppt

Bike Trail Operations and Maintenance单车径的操作与维护.ppt

  1. 1、本文档共39页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Bike Trail Operations and Maintenance单车径的操作与维护

20th National Trails Symposium The Long and Short of Trail Maintenance Operations Manual What When How How often Who Columbia, Missouri Trail Maintenance Costs Presentation by Steve Saitta and Mike Snyder in October 2010 American Trails Newsletter: Concrete $2,980/mile Asphalt 8,672/mile Aggregate (in non-washout area) 5,280/mile Aggregate (in washout area) 16, 904/mile Types of Care Routine Maintenance Periodic Maintenance Long Term Care Blower vs. Sweeper vs. Vacuum ? Vacuum creates major dust in dry weather ? Low profile makes vacuum hard to get over bollards ? Sweeper only gets debris off immediate trail surface ? Leaves piles where sweeper stops ? Blower gets clippings, leaves, twigs, rocks and debris way off of trail Periodic Maintenance – all Surfaces ? Clearance pruning – maintain 3’ setback ? Tree trimming- maintain 12’ height clearance ? Brush cutback – keep shrubs from encroaching into berm Periodic Maintenance - Aggregate Trails Control encroaching vegetation Scarify areas to be corrected Add aggregate if needed Grade and compact Periodic Maintenance - Concrete Trails Edging Seal Cracks Re-stripe annually (if using paint) Periodic Maintenance – Asphalt Trails Edge pavement to prevent vegetation encroachment. Restripe annually (if using paint) Reclamite Chemical composition product Goes on nearly clear Requires 24-hour penetration time Requires sand coat to absorb excess Sand must be swept off before re-open Questions on friction co-efficient GSB - 88 Asphalt emulsion Goes on black Requires masking or re-striping Dries 1- 2 hours Adds silica sand to fill fines, increase friction Pavement Repair - Aggregate Correct underlying Issues Use ripper tines to penetrate into existing surface Add new aggregate to match existing Grade to blend into existing surfaces Compact with vibratory roller Pavement Repair - Concrete ? Saw-cut all joints ? Make sure drainage can occur ? Install porous stone base ? For

文档评论(0)

erterye + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档