自动化专业外文文献及其翻译.doc

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
自动化专业外文文献及其翻译

DYNAMIC SIMULATION APPLICATION IN MODERN POWER PLANT CONTROL AND DESIGNThis paper discusses some experience with PC based continuous dynamic simulation model and its application in the improvement of control philosophy, integration of plant components and diagnosis of plant problems in modem fossil firedpowerplants. The objectives of dynamic simulation studies include new control philosophies evaluation, operational perfortance and analysis, field problem solving, operational procedure development and design confirmation. Some examples are included in the paper as follows:a) Improved pulverizer dynamic response.b) Improved steam temperature control.c) Improved drum level control.d) Reheater and HP bypass attemperation system.e) Sizing of “sweetwater condenser” for steam temperature spray attemperationIntroductionLarge power plants are characterised by non-linear systems with many interactions among their component parts and key control parameters.The operating characteristics of these plants have to be fully understood in order to be able to design an optimal control strategy to meet the specific operational requirements, and to ensure maximum safety and lifetime of such large capitalized investment. However, due to financial considerations, time constraints and the potential risks involved, it is not feasible or safe to do comprehensive tests at a commercial plant for new designs and investigations. Dynamic simulation using a digital computer has become a very useful tool which enables extensive analysis and tests of new designs and investigations. The refinement of existing control philosophy for large fossil plants is also necessary to meet the more stringent operating requirements because more and more large fossil units are being required to perform the daily load cycling previously allocated to smaller units. Such refinement may be investigated using a dynamic simulation model.Since 1986, B&W Nuclear has had an agreement with EPRI, responsible for promoting th

文档评论(0)

almm118 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档