创业集团氯化聚乙烯项目后评价研究工商管理专业论文.docxVIP

创业集团氯化聚乙烯项目后评价研究工商管理专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
创业集团氯化聚乙烯项目后评价研究工商管理专业论文

Abstract The annual investment in fixed assets reaches 25 billion yuan in Daqing Petroleum Administration Bureau, and reaches around 100 million yuan in the Triumph Group. To ensure the safety of project investment is the most important condition for decision. It is very important and necessary to sum up the positive-negative project experiences and accumulate knowledge for future projects. Study on methods of project post evaluation seriously and systematically, and exercise those methods in practice, which is great practical significance for summing up experiences and lessons, providing valuable experiences for the operation of the future projects, reducing the failure rate of investment, increasing the success rate of investment. In this thesis the current status of project post evaluation at home and abroad is briefed, the characteristics, methods and contents are studied. With the background, practical significance, and the actual characteristics of Daqing Petroleum Administration Bureau and the Triumph Group, it makes the project post evaluation for CPE. The comparative method (including any correlation, and after contrast), the logical framework method, and the success rate method are used , and the contents of project post evaluation covers preliminary work on the project, project implementation, the most contents of the project operation. In view of the result for the project post evaluation, makes a conclusion for it. With the problems that are found in the post-project evaluation, the workable and constructive suggestions are put forward in risk management, supervision management, operations management, post evaluation management for Daqing Petroleum Administration Bureau and the Triumph Group. Key words CPE; project post evaluation; study 目 录 摘 要 .................................................................................................................... I HYPERLINK \l _bookmark0 Abstract .......................................................

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档