海绵城市含做法图解-工程案例-.ppt

  1. 1、本文档共147页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* 23/11/2010 Sponsored by UoA Civil and Environmental Engineering and Landcare Research New Strategies for LID-Permeable Pavement * 23/11/2010 Sponsored by UoA Civil and Environmental Engineering and Landcare Research New Strategies for LID-Permeable Pavement * 23/11/2010 Sponsored by UoA Civil and Environmental Engineering and Landcare Research New Strategies for LID-Permeable Pavement * 23/11/2010 Sponsored by UoA Civil and Environmental Engineering and Landcare Research New Strategies for LID-Permeable Pavement * 23/11/2010 Sponsored by UoA Civil and Environmental Engineering and Landcare Research New Strategies for LID-Permeable Pavement * 23/11/2010 Sponsored by UoA Civil and Environmental Engineering and Landcare Research New Strategies for LID-Permeable Pavement * 23/11/2010 Sponsored by UoA Civil and Environmental Engineering and Landcare Research New Strategies for LID-Permeable Pavement * 23/11/2010 Sponsored by UoA Civil and Environmental Engineering and Landcare Research New Strategies for LID-Permeable Pavement * 23/11/2010 Sponsored by UoA Civil and Environmental Engineering and Landcare Research New Strategies for LID-Permeable Pavement * 23/11/2010 Sponsored by UoA Civil and Environmental Engineering and Landcare Research New Strategies for LID-Permeable Pavement 106-105栋、105-104栋:一侧有单元门,一侧一楼庭院,单元门出口预留通道,庭院门口适当合并 106-105栋、105-104栋:一侧有单元门,一侧一楼庭院,单元门出口预留通道,庭院门口适当合并 用30年一遇24小时雨型模拟 * * * * * * * 23/11/2010 Sponsored by UoA Civil and Environmental Engineering and Landcare Research New Strategies for LID-Permeable Pavement * The locations of all of the instruments are shown here. These two areas are equipped as previously shown with the lysimeters and moisture meters at the staggered depths. These two locations are very similar, except they are located outside the infiltration beds for comparison purposes. Finally, the weir and pressure transducer are located at the base of the picture in an inlet. 23/11/2010 Sponsored by UoA Civil and Environmental E

文档评论(0)

lxm + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档