流量自动测调仪控制系统研究-测试计量技术及仪器专业毕业论文.docxVIP

流量自动测调仪控制系统研究-测试计量技术及仪器专业毕业论文.docx

  1. 1、本文档共62页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
万方数据 万方数据 Abstract Abstract Water flooding is the main method to enhance oil recovery. At present, Most of oil field is using one measuring and one adjusting method in our country, only one layer of injection well is measured and adjusted at one time by using this method, This traditional method is high labor-intensive, high-cost, inefficient and has been unable to meet the current needs of production. So this paper explores a kind of high efficient, low cost measuring and adjusting control technology to solve the defects of traditional method. Based on analyzing the current situation of water flooding technology and actual project, an overall scheme for the control system is proposed by this thesis: the hardware software of control system use C8051F040 MCU as the core, hardware circuit mainly includes switching power supply module, decoding module, communication module, switching power supply module adopts a double end forward topology which controls the output voltage and polarity in the control system, down-hole instrument has five movements and each movement is corresponding to the appropriate voltage and polarity, decoding module comprises hardware and software portions, the down-hole code signal is processed by hardware circuit and decoded by MCU, the control system can communicate with the PC for Parameter setting and data uploading by the USB to UART communication circuit. Host computer was designed on the Delphi platform, through which can complete the data processing, down-hole status display and send instructions, etc. After the data processing and comparison by the host computer, the control system will receive an instruction from the host, and each instruction corresponds to the corresponding voltage and polarity. We can control the action of the oil logging tool by the different voltage and polarity and achieve the goal of water flooding. The oil logging tool can be repeated up and down to work till all the work of water III 西安理工大学硕士学位论文 flooding is c

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档