Staged Construction Analysis for Bridges in STAAD.pro 2007 By RAM/STAAD Solution Center 6 February 2007 1 Introduction: Staged Construction Analysis can be performed using STAAD.pro 2007 using the member INACTIVE specification. Staged construction analysis is particularly important in long suspension bridges where stability of the structure must be evaluated at critical stages of construction. The members highlighted in red are the active me