- 1、本文档共30页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Unit 11 Railway Engineering 铁路工程 PartⅠ Introduction to Rail Engineering Railway engineering is a multi-faceted engineering discipline dealing with the design, construction and operation of all types of railway systems. It encompasses(包含/包括) a wide range of engineering disciplines, including civil engineering, computer engineering, electrical engineering, mechanical engineering, industrial engineering and production engineering. Rail track The track on a railway or railroad, also known as the permanent way, is the structure consisting of the rails, fasteners, sleepers and ballast (or slab track), plus the underlying subgrade. Track structure Traditional track structure Advantages: low construction costs, high elasticity, high noise absorption or a high maintainability at relatively low costs. Disadvantages: heavy demand for maintenance, the ballast(道渣/碎石) can be churned up(溅起来) at high speeds, which may cause serious damages to rails and wheels. ballastless tracks Advantages: stable track position, long life cycles, top speed, ride comfort, practically no maintenance and great load-carrying capability. Jointed track In the traditional method, jointed tracks are made using lengths of rails, usually around 20 m long in the UK and 11.9 or 23.8 m long in North America, bolted together using perforated steel plates known as fishplates or joint bars. fishplates Fishplates are usually 600 mm long, used in pairs either side of the rail ends and bolted together with four or six bolts per joint. Continuously welded rail (CRW) CWR refers to the way in which rails are joined to form track. Through CWR, rails are welded together to form one uninterrupted rail that may be several miles long. Flash butt welding Flash butt welding is a technique for joining segments of metal rail or pipe. It often involves an automated track-laying machine running a strong electrical current through the touching ends of two unjoined pieces of rail. Track gauge Track
您可能关注的文档
- 土木工程概论第7章 建筑施工.ppt
- 土木工程概论第9章 暖通空调工程.ppt
- 土木工程概论第11章 工程项目管理.ppt
- 土木工程概论第11章 建设项目管理 (2).ppt
- 土木工程概论第12章 工程经济与造价管理.ppt
- 土木工程概论第13章 发展趋势.ppt
- 土木工程概论第三讲 土木工程在国民经济发展中的地位与作用 .PPT
- 土木工程概论第十讲 桥梁工程 .ppt
- 土木工程概论第十一讲 飞机场工程及港口工程.ppt
- 土木工程概论第五讲 隧道及地下工程.ppt
- 四川省德阳市罗江中学2025届高三考前热身化学试卷含解析.doc
- 山东省枣庄现代实验学校2025届高三下学期第五次调研考试化学试题含解析.doc
- 吉林省长春市十一高中等九校教育联盟2025届高三一诊考试生物试卷含解析.doc
- 2025届江苏省盐城市伍佑中学高考仿真模拟化学试卷含解析.doc
- 2025届广西贺州中学高考冲刺押题(最后一卷)生物试卷含解析.doc
- 安徽省池州市贵池区2025届高三第一次模拟考试生物试卷含解析.doc
- 宁夏银川一中2025届高三(最后冲刺)化学试卷含解析.doc
- 广东省广州市增城区四校联考2025届高考压轴卷化学试卷含解析.doc
- 2025届邯郸市第一中学高考生物必刷试卷含解析.doc
- 2025届安徽省安庆市石化第一中学高考仿真卷化学试卷含解析.doc
文档评论(0)