AS5101.3.1-2008 国外国际规范.pdf

  1. 1、本文档被系统程序自动判定探测到侵权嫌疑,本站暂时做下架处理。
  2. 2、如果您确认为侵权,可联系本站左侧在线QQ客服请求删除。我们会保证在24小时内做出处理,应急电话:400-050-0827。
  3. 3、此文档由网友上传,因疑似侵权的原因,本站不提供该文档下载,只提供部分内容试读。如果您是出版社/作者,看到后可认领文档,您也可以联系本站进行批量认领。
查看更多
1 AS 5101.3.1—2008 Australian Standard® A S Methods for preparation and testing of stabilized 5 1 0 1 materials . 3 . 1 — 2 Method 3.1: Lime or cement content of uncured 0 0 8 stabilized pavement materials (EDTA method) 1 SCOPE This Standard sets out the method for determining the lime or cement content of pavement materials mixed with lime or cement which are sampled from a project under construction and tested within a limited period after the completion of mixing. The method applies to crushed rock materials (see Note). NOTE: Inaccurate results may be obtained with calcareous materials, e.g. calcrete. This may be checked by examining the response of the unstabilized materials to the test procedure. 2 REFERENCED DOCUMENTS The following documents are referred to in this Standard: AS 1141 Methods for sampling and testing aggregates 1141.1 Method 1: Definitions 1141.2 Method 2: Basic testing equipment 1152 Specification for test sieves 1289 Methods of testing soils for engineering purposes 12 Method 1.2.1: Sampling and preparation of soils—Disturbed samples— Standard method 8 3 PRINCIPLE 0 0 2 l u Given the design water and design lime or cement contents of the pavement material to be J

文档评论(0)

xiaoqingtian + 关注
实名认证
内容提供者

xiaoqingtian

1亿VIP精品文档

相关文档