XXXXXX建设工程项目
施工组织设计
XXXX建设集团有限公司
20XX年XX月XX日
目录
一、编制依据、编制原则····························································2 1.1 编制依据·······································································2
1.2 编制原则·······································································2
二、工程概况······································································4
2.1地理概况········································································4
2.2交通、动力和服务设施····························································4
2.3 工程规模·······································································4
2.4 工程特点、难点及解决方案························································6
三、施工准备工作安排······························································7
3.1驻地建设及项目部组织机构························································7
3.2技术准备········································································8
3.3施工总平面布置·································································10
3.4材料组织、供应计划·····························································12
四、施工总体部署及施工工区划分···················································12
五、人员、物资、机械物资动员周期及进场方式·······································13
六、主要工程项目的施工方案、方法················································17
6.1 主要工程项目的施工方案························································17
6.2主要工程项目的施工方法·························································19
6.3桥梁工程施工方法·······························································34
6.4上部结构施工···································································48
七、确保工程质量和工期的措施·····················································58
7.1确保工程质量的措施·····························································58
7.2.确保工程工期的措施····························································64
7.3质量回访保修措施······························································59
7.4.缺陷期内的工程修复····························································64
八、冬季和雨季的施工安排··················································