- 1、本文档共32页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
现场代表 执行设计 管理合同 执行标准 生产准备 组织协调 沟通 质量控制 成本控制 HSE管理 记录、报告 评价承包商 1、现场代表 The Drilling rig supervisor is the Operator representative on location. He is responsible for the protection of Operator’s interests. 钻井现场监督是作业者在现场的代 表,他负责保护作业者的利益。 合同条款规定 公司指派和授权一 个或多个代表在整个钻井期间工作在钻井现场监察检验、检查承包商所做的一切事情,并确认承包商的各种记录。 授权监督代表公司负责监督检查合同中规定承包商应做的相关事宜。 COMPANY shall be entitled to designate a representative or representatives who shall at all times have access to the DRILLING UNIT for the purpose of observing tests, inspecting the work performed by CONTRACTOR or verifying the records of items furnished by CONTRACTOR. Such representative or representatives shall be empowered to act for COMPANY in all matters relating to CONTRACTOR's performance under the CONTRACT. 2、执行设计 钻井监督本人首先要熟悉钻井设计的各个方面,特别关注:井眼尺寸、 井深、套管设计、泥浆设计、定向井设计、评价设计(捞砂样、录井、 取心、测试)、存在的问题(高压、井漏、页岩膨胀等)、井控(防喷 器和套管头的设计)。如果现场出现和设计有差异,要总监讨论,要分 析清楚产生的原因,为什么会出现这样的情况。在执行设计的过程中, 要经常分析判断,为了作业者的利益需要更改设计时,在更改前要和总 监讨论,得到总监的批准。然后,根据更改的设计安排以后的工作。 和执行设计一样,必须认真执行完井设计,要特别关注完井的目的、程 序和实现目的的计划。 Implementing the drilling program must thoroughly familiarize himself with all aspects of the program. Particular concern should be given to the hole size, depths, and casing program; mud program; directional program; evaluation program (sampling, logs, coring and testing); problem areas (high pressure, lost circulation, heaving shale); and well control (bop and wellhead design). Where a program deviates from the routine, he must discuss this with his supervisor and clarify in his mind the reason why. Judgment must be exercised in carrying out the program. When changes are need for the benefit of operator and overall well he should thoroughly discuss this with his supervisor prior to the change. He must use the program to plan ahead. Implementing Completion Program. - The Same Comments Apply Here As For The Drilling Program. Particular Attention Should Be Given To The Objectives Of A Completion And The Procedure And Planning Involved In Accomp
您可能关注的文档
- 全国车险信息共享平台商业车险-v1.4.1-接口规范.doc
- 《1 生活中的交通与安全课件》小学品德与社会北师大课标版四年级下册课件35734.ppt
- 《unit 1 turn left》课件小学英语外研社版一年级起点二年级下册(12月第1版)(1).ppt
- 工程施工组织与管理 第十章 工程施工管理实务(同济大学) ..ppt
- 狂飙突进运动.ppt
- 《方剂学》本科72学时教案.doc
- [资料]变速箱换挡叉的加工工艺及夹具设计(中英文文献).doc
- 地震知识手册.ppt
- 变速箱换挡叉的加工工艺及夹具设计(中英文文献).doc
- 利密托克 limitorque 执行器安装和操作手册(中文)_GAOQS.pdf
文档评论(0)