PPT创意设计方案9.1.ppt

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2007 The conception of XTP was put forward by IHEP; 2008-2012 An advanced research of the XTP was carried out by ISSE; 2013-2014 Completed the system analysis and achieved the mission’s basic parameters . The first step design of the XTP was finished; 2015-2016 With the LAD and WFM adding into the XTP and the parameters of SFA&PFA has changed,redesigned the eXTP satellite; 2017 New launch vehicle; new orbit;new payload;So we update the design of the eXTP satellite. ;3. Basic Parameters;LM-7 launch vehicle ,has a big fairing with diameter of 4200mm a total height of 10300 mm, has maximum capacity for 550km circular orbit at 0 deg. inclination is 4500kg.;The –X axis point to the specific objects in the inertial space ; The sun vector is controlled in XOZ plane and in a obtuse angle with the +Z axis; The sun vector will perpendicular to the solar array by rotate it; According to the user’s observation plan to carry out attitude maneuver,aiming at the burst objects to carry on the observation.;;;4. Preliminary Design;Service module(SVM): the SVM includes all units required to control and operate the S/C platform. The WFM and GRM are accommodated in the SVM, too. LAD Assembly(LADA): the LADA consists of LAD panel(#1~#4), LAD sunshields, deployment mechanisms. The LADA are accomodated on either sides of the SVM. Mirror Assembly Module(MAM): the MAM is located inside the telescope tube , contains the SFA & PFA mirror module and star trackers,with the associated supporting platform. Telescope Tube(TT): the TT allows to maintain the SFA&PFA at the required distance from the focal planes. Focal Plane Assembly (FPA) : the FPA hosts the 13 focal plane cameras, including thermal control hardware. ;4. Preliminary Design;4. Preliminary Design;;4. Preliminary Design;4. Preliminary Design;4. Preliminary Design;4. Preliminary Design;4. Preliminary Design;Phase A:2017.01~2017.12, international coordination, feasibility design ~2017.08, S

文档评论(0)

italiainzaghi + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档