- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Sondu/Miriu Hydropower Project
Sang’oro Power Plant
Contract. No.
SDM08
Employer
KENGEN
Engineer
Nippon Koei Co.,Ltd.
Contractor
Sinohydro Corporation Ltd.
Document No.
MD-06-B2-05-004 (R1)
Page (s)
5
Date
16th Mar 2011
OPERATION AND MAINTENANCE MANUAL
OF GENERATOR
(Lot AP-2)
R1
16th Mar 2011
1st Submission
REV.
DATE
PREPARED
CHECKED
ENDORSED
APPROVED
Description
Format : A4
1 Operation of generator
1.1 Preparations before start-up, including:
a) Clean the work-yard and the generator set from any debris.
b) Check the tightening condition, lock the gasket tightly, tack weld if necessary; keep the rotatable parts clean.
c) Check the inlet and outlet water pipelines, oil pipelines and valves, in order to know if there are leakages and problems of water flow in the pipe.
d) Check the level of lubricating oil, oil number, oil quality, water pressure, and record the water temperature and ambient temperature.
e) Check each connecting cable, to make sure that the joints contact well and without rust, connection is right, and the marks are complete and distinct.
f) Check if the equipments of high-pressure oil and the brake run normally, and if the brake pressure can meet the relevant requirements.
g) Check the fire extinguishing system and other protecting facilities, to ensure security.
h) Check the gaps between rotating parts and stationary parts, especially when there are dimension requirements.
i) Make preparation work of recording before start-up.
1.2 Initial no-load start-up operation
The time of initial start-up of generator, operating sequence and the general commander shall be determined through consultation among the buyer, the seller and the installation entity.
1.2.1 Under the organization of the general commander, the operators and monitors shall get
1.2.2 Before start-up, first open the cooling water of the upper and lower oil cooler and air cooler. The temperature of the oil in the oil tank shall not be lower than 100C, and that in the plas
您可能关注的文档
- 北京天坛故宫英语导游词大全.doc
- 北师大必修3 英语 知识点总结,语法.doc
- 北京理工大学英语期末考试口语Wealth is the measure of success.doc
- 北师大版七上英语同步练习题Lesson 7.doc
- 北师大版选修6Unit18导学提纲答案.doc
- 北理工网络教育大学英语2整理版答案.doc
- 北航研究生英语入学考试.doc
- 北语 19春《英语基础写作》作业.doc
- 宝安实验学校第二届英语节.doc
- 北师大版必修四Unit10 Lesson3 Your money课件.ppt
- 人教版数学九年级上册《 二次函数》说课稿(共19张PPT).ppt
- 人教版八年级上册 12.2.2三角形全等的判定 “边角边”判定三角形全等 (共22张PPT).ppt
- 人教版初中数学2011课标版八年级上册第十二章12.2 三角形全等的判定 课件(共16张PPT).ppt
- 人教版九年级第十单元课题1浓硫酸1 (共18张PPT).ppt
- 人教版初中数学七年级上册 1.4 有理数的乘除法(共22张PPT).ppt
- 人教版八年级物理上册第1章 第2节运动的描述习题课件(共20张PPT).ppt
- 人教版九年级课题2酸和碱之间会发生什么反应(共21张PPT).ppt
- 人教版初中物理2011课标版 九年级 第十八章 电功率第三节 测量小灯泡的电功率(共25张PPT).pptx
- 人教版初中数学2011课标版九年级上册第二十四章24.1圆的有关性质(共17张PPT).ppt
- 人教版初中数学2011课标版九年级上册21.2解一元二次方程(共22张PPT).pptx
原创力文档


文档评论(0)