风险学习管理英文版本.docx

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Risk Assessment Part 1:Assessment with existing control measures A Activity (or area) being assessed: ?Dytel/Moore Vernon Gauges B Business: ?TURBINE SYSTEMS Assessment ref. no. ? Department: ?DIMENSIONAL People Rolls-Royce: 8 Frequency/duration: 8hs 3shfts Date of assessment: ? 31/03/04 Dept. no.: ?2225 affected: Assessor(s)/team: ? Others: 0 Frequency/duration: N/A ? Location: ?PCF ? Q Periodic reviews –maximum 1st Review 2nd Review 3rd Review 4th Review Date: 31/03/05 Date: Date: Date: intervals for activities with: Name: Name: Name: Name: Medium risk (but ALARP) - annually Low risk - three-yearly Signed: Signed: Signed: Signed: C E G H J D F Consequence (outcome) Hazard Hazardous event Foreseeable cause Details of harm Value Existing control measures Probability Risk (potential for harm) (what happens) (cause of hazardous event) 1 to 5 used 1 to 5 1 to 25 Example: Fall from ladder Loss of balance Broken limbs 3 Ladder in good condition, at 3 9 Working at height correct angle and tied off medium 1Trapped Hand Fixture closing on Unsafe working practices Broken fingers 1 Safe procedures,Machine 1 2 components integrated 2Operation of machine RSI Continuous loading & Wrist & backache 2 Intermittent breaks 3 6 unloading of components 3Visual imparement Examining results on display Continuous use of DSE Gradual deteration of 3 DSE legislation, not a 2 6 screens eyesight continuous process Finish area extraction & Area is ppe controlled & 4Noise General factory noise Gradual hearing impairment 3 hearing protection must 2 6 machine noise be worn 5Physical injury Dropping of tooling fixtures unsafe working practices Bruises & abrasions, 1 Operator training 1 2 possible broken fingers 6Hand held tooling Vibration white finger from Continuous use of air tools Vibration white finger 2 Annual monitoring @ OHD 2 6 vibration moving parts Risk Assessment Part 2: Assessment of risk reduction actions K Proposed actions (risk reduction measures) Example (continued): Use tower sc

文档评论(0)

130****3819 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档