- 1、本文档共26页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
附录
SLAC-PUB-3620
April 1985
(A)
APPLICATION OF GPS IN A HIGH PRECISION
ENGINEERING SURVEY NET WORK
ROBERT RULAND, ALFRED LEICK
ABSTRACT.A GPS satellite survey was carried out with the Macrometer to sup-port construction at the Stanford Linear Accelerator Center(SLAC).The networkconsists of 16 stations of which 9 stations were part of the Macrometer network.The horizontal and vertical accuracy of the GPS survey is estimated to be l-2 m m and2-3 m m respectively.The horizontal accuracy of the terrestrial survey,consisting of angles and distances,equals that of the GPS survey only in the“loop”portion ofthe network.All stations are part of a precise level network.The ellipsoidal heightsobtained from the GPS survey and the orthometric heights of the level network are used to compute geoid undulations.A geoid profile along the linac was computed by the National Geodetic Survey in 1963.This profile agreed with the observed geoid within the standard deviation of the GPS survey.Angles and distances were adjusted together(TERRA),and all terrestrial observations were combined with the GPS vector observations in a combination adjustment(COMB).A comparison of C O M B and TERRA revealed systematic errors in the terrestrial solution.A scale factor of 1.5 ppm f.8 ppm was estimated.This value is of the same magnitude as the over-all horizontal accuracy of both networks.
INTRODUCTION
At the Stanford Linear Accelerator Center a new project is under construction,the Stanford Linear Collider(SLC).The shape of the completed SLC will be like a tennis racket with the handle being the existing linac and the curved parts being the new North and South collider arcs.The diameter formed by the loop will be about 1 km.To position the approximately 1000 magnets in the arc tunnels,a network of nearby reference marks is necessary(Pietryka 1985).An error analysis has shown that a tunnel traverse cannot supply reference points with the required accuracy.Therefore,a work with ve
您可能关注的文档
- 银行排队系统的统计调查与效率分析外文文献翻译.doc
- SPA市场-外文翻译.doc
- 苯-氯苯连续精馏塔设计---精馏塔外文翻译.doc
- 论企业薪酬战略与经营战略的匹配外文翻译.doc
- 中小企业财务管理现状与对策毕业论文开题报告.doc
- Influence of American and China Cultural differences on毕业论文开题报告.doc
- newton迭代法在解非线性方程组的应用论文开题报告.doc
- 半双工无线收发系统的设计论文开题报告.doc
- 本科生开题报告_机电产品设计----阀门电动装置(行星齿轮).doc
- 单向双筋板结构件的振动疲劳分析毕业论文开题报告.doc
- 幼儿教师资格证(考试资料)《幼儿保健知识与能力》新版初级练习卷有答案与.docx
- (附答案)川农12月《中药化学》作业考核-.docx
- (附答案)川农12月《园林植物保护学(本科)》作业考核-.docx
- (附答案)川农12月《有机化学(专科)》作业考核-.docx
- (附答案)川农12月《植物保护学(本科)》作业考核-.docx
- (附答案)东师《教育心理学》在线作业2-1(1).docx
- (附答案)川农12月《药剂学》作业考核-.docx
- (附答案)川农12月《配方饲料制造工艺与技术(专科)》作业考核-.docx
- 幼儿教师资格证(考试资料)《幼儿保健知识与能力》新版基础知识题库带解析.docx
- 幼儿教师资格证(考试资料)《幼儿保健知识与能力》基础知识模拟押题卷.docx
文档评论(0)