CHRPManagers Meeting October 2009.ppt

  1. 1、本文档共19页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
CHRPManagers Meeting October 2009.ppt

CHRP/Managers Meeting October 2009 Angelo Liberti, Chief Surface Water Protection Office of Water Resources 401.222.4700 ext 7225 angelo.liberti@dem.ri.gov NBC CSO Project Phase I tunnel - operational Nov 2008 Post storm monitoring Re-assess Rainfall Closure Criteria Phase II - preliminary design completed Current Plan for Managing Nutrients From WWTF 50% Reduction from RI WWTFs DEM permits issued – June 2005 Comparable reductions from MA WWTFs Revised WWTF Nitrogen Limits 5 mg/l UBWPAD Woonsocket (3 mg/l) NBC-Fields Pt. NBC Bucklin Pt. East Greenwich No. Attleborough Attleboro Grafton Uxbridge Northbridge (max extent) Limits May – October, require operation of treatment to remove N to max extent possible November-April East Providence Cranston West Warwick Warwick Smithfield (10 mg/l) Burrillville (max extent) - Warren – anticipated to address impacts to the Palmer River 8 mg/l Current Status of Load Reduction Efforts 8 - WWTFs have complete upgrades (2 require additional modifications) 1 - Under construction NBC Fields Point (completion by 12/31/2013) 1 – Planning Underway Woonsocket (Plan was due 8/09, construction by 3/2014) 2 - Design Underway NBC Bucklin Point East Providence (due 6/01/10, construction by 9/2012 Approximately 30% reduction in RI WWTF load achieved in 2005. Next significant reduction May 2014 Status of Compliance with Revised Permit limits for N MA WWTFs North Attleborough 8 mg/l EPA issued 2/08; appeals settled (complete construction late 2012) Attleboro 8 mg/l EPA issued 6/08; Permit upheld on appeal. EAB decision issued 9/15/09. Upper Blackstone (UBWPAD) 5 mg/l EPA issued 8/08; appeals filed. Oral arguments before EAB 10/29/09 Grafton 8 mg/l No action to date Uxbridge 8 mg/l No action to date Northbridge NA EPA issued 9/06; reduce N to max extent Status of Compliance with Revised Permit limits for N RI WWTFs Limit Status Ave TN (mg/l) 5/07-8/08 Cranston 8 mg/l Construction comp. –1/2006. Additional modifica

文档评论(0)

gshshxx + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档