FMEA Training2.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Failure Mode Effect Analysis Explanation and Use of FMEA What is FMEA? FMEA is a problem solving process adopted by Snap-on as a key component of the Quality Forward System. Generally, FMEA is done by an on-site multifunctional team facilitated locally or by an SEQ Group Advanced Quality Engineer. Objective is to identify all of the reasons why quality of a process or product does not meet expectations. Uses severity, occurrence and detection ratings to determine corrective action priority for each possible failure reason. When should a FMEA study be conducted? As part of a Design/Development phase. When corrective action is needed due to unfavorable performance data –(performance based on QFS metrics does not meet goals). When a need to make incremental improvement is identified by facility management or the SEQ Group. FMEA Team Start-Up Team Selection –done by local quality coordinator, business unit manager or, on request, SEQ Group Advanced Quality Engineer. Problem Statement –A concise and focused description of the quality problem or opportunity for improvement, “what went wrong”or “what needs fixing”. Goal Statement –a description of what is to be accomplished by the team, in quantifiable terms “reduce by”, “increase by”, “eliminate”, etc. Good metrics to use include scrap cost, rework cost, or Defects Per Million Opportunities (DPMO), etc. For example, a goal statement could be “To reduce DPMO on product family X from 3000 to 2000 by year end”. Complete FMEA Team Start-Up Worksheet (example located in procedure SEQ 80.10, Figure 1). Problem Statement Goal Statement Problem Statement and Goal Statement should consider: What went wrong? What is the gap between the desired quality level and the actual quality level? Which process or processes are involved? Which department or cell is the deficiency occurring in? Is the problem cyclic, can it be attributed to specific events? What are the appropriate metrics to measure? What is the impact on operational fitnes

文档评论(0)

山丹丹 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档