污水厂毕业设计.doc

  1. 1、本文档共114页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
正文摘要 本设计是省的城市排水工程。其由两部分组成,即城市排水管网系统的设计和城市污水处理厂的设计。其中初步设计要完成设计说明书一份、城市给排水系统总平面图、污水处理厂总平面布置图一张、污水厂污水与污泥处理高程图一张、污水总泵站或中途提升泵站工艺施工图一张,污水与污泥主要构筑物工艺图两张;单项处理构筑物工艺图设计中,主要是完成的平面图和剖面图。该污水处理厂工程,总规模万吨/日。本设计处理的对象为城市污水,主要污染物质为悬浮固体(SS)及溶解和胶体状态的有机污染物(BOD)。 根据城市所处的地理位置和污水厂的规模,并结合考虑需脱氮除磷的要求,城市污水处理厂设计采用A2/O工艺。该工艺污水处理流程为:从格栅到泵房,进入细格栅,沉砂池,,二沉池,消毒池,出水排放。污泥处理流程为:从二沉池和初沉池排除的剩余污泥首先进入污泥提升泵房,进贮泥池,污泥脱水间,泥饼外运。通过此工艺的处理,出水水质将达到《城镇污水处理厂污染物排放标准》(GB18918-2002)一级标准。 关键词:;脱氮;除磷;城市排水管网;城市污水处理厂 英文摘要 The problem of environmental pollution is nowadays one of the greatest social concerns in the world, especially overexploitation and unreasonable use of the water resource. The water resource of rational utilization is the key to solving these problems。So the development of water treatment plays a decisive role to realize our country the sustainable strategic objective. The design is a drainage system in a town of huaqiao of jiangsu Province. It is made up of two parts, namely, the design of the system of urban drainage pipeline networks and design of the urban sewage treatment plant. During the preliminary design, we must complete a brochure, a map of general layout, an elevation map, a flow chart, a map of major equipment, piping layout; Construction of structures to deal with individual designs, is complete anaerobic-anoxic-aerobic tank plants and profiles. The sewage treatment plant project, the total amount to 20,000 tons/day. According to town’s geographical position and scale of sewage treatment plant, combining with the demand of denitrification and dephosphorization in treatment process, the sewage treatment plant designs and adopts A2/O craft. The sewage disposal procedure is: from the medium screen to the pumping station, the fine screen, the grit pool, the preliminary settling tank, the anaerobic pool, the anaerobic-anoxic-aerobic part, the secondary settling tank, the disinfection tank, the electromagnetic flow meter, discharged into the river. The sludge treatment procedure is: from the settlin

您可能关注的文档

文档评论(0)

2749166188 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档