网站大量收购闲置独家精品文档,联系QQ:2885784924

某X港5万吨级多用途码头设计梁板式高桩码头结构.doc

某X港5万吨级多用途码头设计梁板式高桩码头结构.doc

  1. 1、本文档共82页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PAGE XXXX港一期5万吨级多用途码头设计 梁板式高桩码头结构 Dongying Port Beam piling wharf structure 摘 要 中国XXXX港、东营港经济开发区位于中国黄河三角洲中心城市东营市东北部,北邻京津塘经济区,南连胶东半岛,濒临 HYPERLINK /view/45137.htm \t _blank 渤海西南海岸,地处黄河经济带与环渤海经济圈的交汇点。本次设计5万吨级泊位的多用途高桩码头,主要是散货船与集装箱船。根据设计工艺要求,码头总长为1348m,码头前沿底高程-15.58m,和码头面高程+5.5m,在地形的横断面图中可确定码头结构的总宽度为59.57m。其中,前方桩台宽37m,主要用于装卸桥的布置;后方桩台宽15m,主要起连接作用。面板采用预制板,搭接在纵梁上。纵梁分为装卸桥轨道梁(轨距30m)、一般纵梁和边纵梁,纵梁搭在桩帽上。由于时间限制本设计只给出门机轨道梁及其悬臂部分和一般纵梁的具体计算过程。本设计重点部分是横向排架计算,采用桩两端为铰接柔性桩台的计算方法,具体见计算书后面部分横向排架间距为7m,桩长为55米。 关键词: 多用途码头;泊位;集装箱;装卸桥 ABSTRACT In camp City the northeast of Chinese yellow river delta, the east of city of center, the east camp harbor of China Shandong, the east camp harbor economy development niches north borders on Jin pond economic area in city, south connect gum east peninsula, get close to southwest coast in Bohai Sea, the ground yellow river economy takes to remit a point with handing over of economic turn in wreath Bohai Sea.The design 50,000 ton class berths of many uses high stake wharf, mainly is spread cargo vessel with gather to pack a ship.Request according to the design craft, the wharf always grows for the 1348 ms, the wharf is ex- to follow bottom of Gao Cheng-15.58 ms, and wharf noodles Gao Cheng+5.5 ms, can make sure the total width of wharf structure to 59.57 ms in the cross section diagram of geography.Among them, front stake the pedestal breadth 37 ms, mainly used for the decoration that packs to unload bridge;Rear stake the pedestal breadth 15 ms, mainly have a conjunction function.The front-panel adoption prepares to make plank and takes to connect on the Zong beam.The Zong beam is divided into to pack to unload the bridge orbit beam(the gauge 30 ms), general Zong beam and the side Zong beam, the Zong beam takes a hat at the stake up.Because time limits this design to go out machine orbit beam and it hangs the concrete calculation process of arm part and general Zong beam.The Zong beam presses the rigid calculation for propping ups continuous beam.The h

您可能关注的文档

文档评论(0)

好老师 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档