网站大量收购独家精品文档,联系QQ:2885784924

钢结构施工外文翻译——钢结构工程施工方案.doc

钢结构施工外文翻译——钢结构工程施工方案.doc

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Steel Structure Construction Scheme Ⅰ.A brief account of steel structure work There will be 6 8t bridge traveling cranes in production hall, welding H-section steel column and beam, structural main material is Q345B, cold bending sheet steel Z-purlin, wall and roof cladding are double-skin pressed steel sheet and thermal insulation wool. Ⅱ.Characteristic of steel structure work The single span of the work is 18m, the height of steel column is large, single frame plane external rigidity is very small, so the key point of safety technical control is to guarantee the stability outside the structural plane. Take out 6 steel columns from grid line 9~14 in the production building, instead of 52.5m space truss as trimmer beam to support the upper structure and crane load, the installation of the space truss is a difficulty point of this work. Ⅲ.Fabrication of steel structural members Technical preparations prior fabrication 1. Study and check the design working drawing before fabrication, make shop drawing and get approval from designer then prepare material for fabrication. 2. Make a plan and program for fabrication as per the type, quantity and material of the structural members. 3. Write construction techniques and technical measures, and the equipment regular examine and maintain plan, keep the machinery in good condition. Material requirements: 1. Select and confirm the material for the project. 2. All kinds of material should be with quality guarantee and ex-factory certificate. If there is any doubt, sampling examination should be taken according to relevant national standard, only when passed the examination material in batches can be used. 3. Rust degree of steel surface should conform to the present national standard rust and rust removal degree before painting. 4. Jointing material (welding rod, solder, flux), high strength bolt, and coating( under coat and top coating) should be with ex-factory quality certificate and conform to the design and national sta

文档评论(0)

嫣雨流纱 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档