双滚筒绞车运输研究设计与制作毕业设计说明书.docVIP

双滚筒绞车运输研究设计与制作毕业设计说明书.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
摘要 本毕业设计的课题来源于主要任务是设计。 在的基础上,对进行了设计,对一些关键部分进行了设计计算。重点是。 本ABSTRCT The design of the subject from “Some coal application project of ZhangQiu”, Main task is suitable for the design of automatic tube dispatch hoist compulsory rope device. Based on double drum drawwork transport reflects the rope is bad, easy to cause the inclined lane wirerope break car accidents, design for lane and slope for 0-25 ° inclined lane rope hoist automatic device, to effectively control and prevention, car accidents, thoroughly improve transportation safety in mines, eliminate inclined lane transportation security hidden danger, in reference to other application rope machine, on the basis of mine is applicable to the double barrel rope hoist scheduling mechanism design, some key parts design calculation. The rope is how the organization, the purpose and forced the rope dynamic source. This design in the double barrel scheduling winch in existing configuration and not big reconstruction of hoist scheduling based on the power of the motor hoist speed and output calculation in design, we make a week in rotating drum under the condition of ball screw rotation to a rope distance is 20 mm. In order to achieve this purpose joined deceleration institutions established transmission relations, not big to hoist the winch and free installation, make mention inoue rope institutions of power comes from the drum, using the sprocket, considering double roller, and applied in the rope of roller drum of ascending and descending, so when the design by the rope. After a rope institutions from power before a rope institution ball screw. To solve the rope and the positive question, drum in transmission between a power conversion device respectively. The transfer process, from the motivation for the cylinder by sprocket to slow conversion device among institutions make ball screw rotation, ball screw speed will speed reduction through the middle conversion device by sprocket after a rope to the organization and it

文档评论(0)

大吧书屋 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档