- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
VirusEscalationProcedure:病毒升级程序.doc
Virus Escalation Procedure
Background
This document has been produced in response to a number of virus issues that have occurred within Knowsley Schools.
Failure to deal with virus problems quickly and efficiently can result in a detrimental effect on all users of Information Technology within Knowsley.
All users and support organisations of IT have a responsibility to ensure that security is maintained at all times.
There are three possible scenarios to consider:
A reoccurring problem on one site indicating that there is poor management of security on the site.
A virus attack that is an immediate direct threat to all other network users.
A problem involving less than 3 machines.
It is proposed that the following escalation procedures are adopted by the Learning and Technology Strategy Board to ensure that network integrity is maintained at all times to the highest possible standards.
Attached Documents
Draft copies of e-mails to schools
Flow diagram of procedureEscalation Procedure
Less than 3 Machine Problem Reoccurring Problem A major threat to the Knowsley network A security problem is identified by ITD which requires action by a support team or school ITD Inform Principal Manager: Technology, Systems and Communications /Representative Relationship Managers School notified by Relationship Managers with a follow up e-mail to the Head Teacher.
KSSC notified if school supported A decision is made on shutting down the CIN link. A decision is made on shutting down the CIN link. The appropriate support team have 3 hours to remove the device from the network. Relationship Managers informed of decision Relationship Managers informed of decision ITD check after 3 hours to see if the device is still on the network and inform Relationship Manager accordingly. School notified by Relationship Managers with a follow up e-mail to the Head Teacher. School notified by Relationship Managers with a follow up e-mail to the Head Teacher. If the device is still on the net
您可能关注的文档
- Siemenspaper.doc
- SignificantdatesinYumahistory-WelcomeToYuma:尤马历史上的重要日期:欢迎来到尤马.doc
- SIMULINK建立系统模型并仿真.doc
- sim的软硬件接口.doc
- SJJF—1分度头技术协议.doc
- Sketchup组件制作.doc
- SMG2000E数字双钳相位伏安表55878.doc
- SMG2000单相继电保护测试仪.doc
- SmithFamilyFoundationJoslinDiabetesCenterDiabetes:史密斯一家foundationjoslin糖尿病中心糖尿病.doc
- SMT+零件推力标...doc
最近下载
- 中国云新南航空公司acars系统培训.ppt VIP
- 马克思主义宗教观87814.ppt VIP
- 《城市轨道交通通信与信号》教案 第11课 城市轨道交通通信系统(一).docx VIP
- 大众蔚领保养手册.docx VIP
- 部编人教版小学4四年级语文上册(全册)优秀教案设计.doc VIP
- 道德与法治新教材培训心得体会.pptx VIP
- 2026年高考化学大一轮复习第3讲离子共存 离子的检验与推断.pptx VIP
- 冯唐成事心法读书札记.docx VIP
- 第1课 时代精神的精华-【中职专用】2024年中职思想政治《哲学与人生》金牌课件(高教版2023·基础模块).pptx VIP
- 《新闻采访与写作》电子课件 第三章 新闻采写的客体——新闻事实.ppt VIP
文档评论(0)