- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
海外通信网优案例分享-PSRABSetupSuccessRatedegradationanalysis.doc
PS RAB Setup Success Rate Degradation Analysis 200912
Issue Description
From 29th, Nov, the PS RAB setup success rate has obvious degradation and gets worse down to 96.3% on the 18th, Nov.
PS RAB setup failure analysis
According to the data 19th Nov, we find the power congestion and transmission (IUPS) is the main reason of RAB setup failure. The Iub congestion is also affect the PS RAB setup success rate.
PS RAB Setup Failure due to power analysis
Below are the top 5 power congestion cells. the cell 16618 is most serious which have 32266 time PS power congestion and make up of 96.5% in the all the power congestion.
From CHR of 16618, we can see the detailed power congestion reason is NBM_CRA_CELL_RR_DL_NON_HSDPA_PWR_FAIL which indicate R99 DL power congestion.
As the real time user number trace show, we can see the DCH USER NUMBER is up to 62 and the HSDPA USER NUMBER is up to 17 which lead to overload and serious power congestion.
For the power congestion of 16618, we have taken below action: But the power congestion of cell 16618 is still serious and the user is also too much. So we have to take more action.
Active power LDR and the LDR action is BE traffic rate decrease.
Tuning CS service inter-rat handover 2D and 2F threshold
Increase E-tilt form 2 to 4.
PS RAB Setup Failure due to TNL analysis
This issue is for the whole RNC and we have discussed before. It is due to IUPS issue which we have sent report to implement IUPS expansion. At the same time we can tune IUPS activity factor as the temporary action.
PS RAB Setup Failure due to Iub analysis
As the top 5 IUB congestion cells show, we can see the 3 cells of site 1714 are the most serious which utilization has been up to 84.4%. The CHR also indicated the failure reason is NBM_CRA_CELL_RR_IUB_DL_FAIL. So we propose to tune the IUB activity factor firstly and monitor the KPIs.
Conclusion
The reasons of PS RAB setup failure are as below:
Power congestion especially cell 16618
IUPS issue
IUB congestion esp
您可能关注的文档
最近下载
- 人民版综合实践活动三年级下册第10课《萝卜的种植》课件.ppt
- 《老年慢性肾脏病综合管理指南(2025年版)》解读PPT课件.pptx VIP
- 癌痛规范化治疗示范病房标准.docx VIP
- 氟化钾MSDS.doc VIP
- 2025食品检验员资格证考试试题库及答案答案.docx
- 2024数据中心浸没式液冷系统单相冷却液技术指标和测试方法.docx VIP
- G02-2019 房屋建筑工程抗震构造设计.docx VIP
- 2024KDIGO慢性肾脏病评估和管理指南要点解读.pptx VIP
- 2025年党风廉风建设试题及完整答案.pdf VIP
- 2025年文房四宝行业分析报告及未来五到十年行业预测分析报告.docx
文档评论(0)