文华苑住宅小区地基处理毕业设计.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
摘 要 昆明文华苑住宅小区2号楼位于西山区政府办公楼西侧。场地愿为耕地鱼塘,多位中高压缩性深厚软土,其有机质含量较高、天然地基承载力较低,含水量较大。场地后期经人工堆填,地势较为平坦,地貌上处于昆明湖积盆地中西部,拟建住宅楼为7层框架结构,占地面积54.6×23.5㎡,拟建物对差异沉降敏感,建筑物安全等级为二级。 结合技术可行性、处理可靠性、经济合理性这三个方面加以考虑,决定采用深层搅拌桩粉体喷射法进行地基处理。经过一系列的设计计算,采用深层搅拌桩直径为500㎜,有效桩长9.0m,单桩承载力设计值为118kN,共打深层搅拌桩1238根,工期为24天,工程总造价为969744.7元。 Abstract No.2 building of KunMing Wen Huayuan uptown is located in the west of the office building of XiShan district government. The building site was plantation and pound in the past, and was filled by hand later. The subsoil is mainly deep thick soft soil which has a high compressibility, and contains a lot of organism. The bearing capacity of the natural subsoil is low while the moisture content is great. The physiognomy of the field is flat, and when it refers to relief, it is landed on the mid west of KunMing lake basin. The residential building to build is a seven-storied building and has a framed structure. The building area is 54.6 by 23.5 square meters. According to the design requests, the building planned to build is sensitive to the differential settlement, and the construction safety class is second-degree. After the analysis and contrast on the feasibility of the technique, the reliability of the treatment and the reasonableness of the economy, powder-deep-mixing method was decided to be used to reinforce the subsoil. Through a series of calculation, the diameter of the deep mixing pile used is decided to be 500 mm, the available length of the pile is 9 meters, the bearing capacity of a single pile is designed to be 118 kN, and there are 1238 piles used in all. The construction period is calculated to be 24 days and the construction cost is¥969744.70. 目 录 第一部分 工程设计 1 工程概况…………………………………………………………………………………1 1.1 上部结构及载荷情况………………………………………………………………1 1.2 工程地质概况……………………………………………………………………1 1.3 水文地质条件……………………………………………………………………2 2. 工程方案论证及选择………………………………………………………………2 2.1初步选择施工方案………………………………………………………………2 2.2施工方案论证……………………………………………………………………2 2.3最优方案的选择………………………

文档评论(0)

weidameili + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档