June 17, 2009.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
June 17, 2009.ppt

Approved For Public Release Approved For Public Release ? The Aerospace Corporation 2009 ? The Aerospace Corporation 2008 Approved For Public Release June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of U.S. Human Space Flight Plans Committee Gary Pulliam Vice President Civil and Commercial Operations The Aerospace Corporation * Background EELV Human Rating Study, Mar-Aug 2005 Architecture Strategic Analysis Task, Jul-Dec 2008 Architecture Strategic Analysis Task Forward Action Plan, Dec 2008-May 2009 * Study Scope Study examines technical and programmatic feasibility of replacing Ares I with a human-rated Delta IV Heavy and associated impacts on existing Constellation architecture Study did not include: Alternate Constellation architectures Confidence of Ares I cost and schedule * Options Six configurations studied: Delta IV Heavy (H) baseline (not human rated) Human Rated (HR) Delta IV H with Ares I upper stage including J-2X engine HR Delta IV H with resized J-2X upper stage HR Delta IV H redesigned upper stage with 4 RL-10 derivative engines HR Delta IV H with no upper stage HR Delta IV H with single RL-10 engine derivative Atlas V Heavy not considered due to design maturity relative to Delta IV Heavy * Technical Findings (1 of 2) Implementation of Human Rating Requirements (Safety and Reliability), commensurate with Ares I approach, is technically feasible for HR Delta IV H New upper stage configurations with J-2X or four RL-10 derivatives are technically feasible and exceed Ares I performance to ISS and LEO targets Human rated version of upper stage with one RL-10 derivative may match Ares I gross performance More detailed examination of trade space required The no upper stage configuration using Orion Service Module shows feasible performance to ISS target, but not Lunar target * Technical Findings (2 of 2) Industrial capacity can accommodate increases in production and hardware transportation for HR Delta I

文档评论(0)

gshshxx + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档