- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
英文施工合同工程合同sample construction contract-2.pdf
CONSTRUCTION CONTRACT
THIS AGREEMENT is made and entered into this ____ day of________, 20XX, by and
between the COUNTY OF MONTROSE, Colorado, by and through its Board of County
Commissioners (hereinafter called Owner or County), and ________________,
(hereinafter called Contractor), for the Construction Project known as:
The Owners Representative (OR) is _____________________________ .
The Owner and Contractor agree as follows:
ARTICLE 1
THE WORK:
The Contractor shall complete all the work on the _________________________ as
specified in the Scope of Work included and also contained in the RFP attached hereto
and incorporated herein. The Work is generally described as
____________________________ .
ARTICLE 2
TIME OF COMMENCEMENT AND COMPLETION:
2.1 The Work to be performed under this Contract shall be commenced upon receipt
of a Notice to Proceed and completed by ______________ . Start date is
anticipated to be on or about ________________ .
2.2 Except as otherwise required for the safety or protection of persons or the Work
or property at the Work Site or adjacent thereto, all Work at the Site shall be
performed between the hours of 7 AM and 5:30 PM, Monday through Friday,
unless otherwise provided in writing by Owner or OR, such consent not to be
unreasonably withheld.
ARTICLE 3
CONTRACT AMOUNT AND BASIS:
The Owner shall pay the Contractor the amount of $_____________________ for the
satisfactory performance of the Work, subject to additions and deductions by Change
Order as provided in the General Conditions, the following:
The unit price set forth on the Bid Schedule shall be the basis for the contract
price. Payment at the unit price will be based on actual measured quan
您可能关注的文档
最近下载
- 长沙市长郡中学新初一分班语文试卷.doc VIP
- CB T 3988-2008 甲板室放水塞.pdf VIP
- 时间管理培训ppt(共44张)ppt学习教案.pptx VIP
- 在线网课学习课堂《消防燃烧学(消校)》单元测试考核答案.docx VIP
- 2001-2020年中国大陆历年上映电影中烟草酒精镜头分析(最终版).docx VIP
- 2024阳西县中小学教师招聘考试试卷及答案.docx VIP
- 滨州市基础教育满意度测评.docx VIP
- 碧桂园西北区域春季校招综合能力在线测评.docx VIP
- 2025年医院实验室生物安全手册(完整版).pdf VIP
- 关于菏泽水浒文旅融合的调查问卷.docx VIP
文档评论(0)