- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Applicationofsynchronous.doc
Application of synchronous tracking method of cost and schedule control division component project cost. What the construction phase, the corresponding cost should occur. If you dont corresponding cost and schedule, will be regarded as abnormal phenomenon is analyzed, find out why, and to correct them.
3. Build system of project monthly financial revenue and expenditure plans, to use plan control cost expenses.
4. Set up with the center of the project cost accounting system, audit visa system in project cost control cost expense.
5. Management standardized, scientific, establish and perfect the cost accounting, cost analysis and cost assessment system.
6. To carry out the three simultaneous check regularly.
7. By the method of cost analysis table control project cost. Cost analysis table, including monthly cost analysis table and the final cost control report. Monthly cost analysis table and direct cost analysis table and two kinds of indirect cost analysis table.
Five, the construction cost control measures
1. Labor cost control measures. Tight labor organization, reasonable arrangement of production workers in the factory; Closely the work quota management, piecework wage; Strengthen the technical training, strengthen the production workers technical quality, improve labor productivity.
2. Engineering equipment cost control measures. In order to strengthen the management of engineering equipment, control equipment purchase cost, transportation cost, quality cost.
3. The material purchasing cost control measures. From two aspects of quantity and price control. Especially the project engineering containing materials, such as non-standard equipment installation. Material consumption quantity control, adopt quota acquisition and effective control of field construction material consumption.
4. The cost of construction machinery control measures. Optimization of construction scheme; Strictly control the leasing of construction machinery; Improve the utilizatio