Crane Toppling Incident.ppt
IINCIDENT SUMMARY: Carbon Steel Shop EVENTS LEADING UP TO INCIDENT: SEQUENCE OF EVENTS. OTHER FINDINGS Copyright: SIPC Shell Product Brand Contractor Crane Topple Incident PRELIMINARY: INVESTIGATION ONGOING At about 1330hrs on Saturday December 20, 2008, a 70 ton Groove crane toppled whilst it was being brought into operation for the loading of pipe spools at xxxxxxxxxxxxx The crane operator jumped out of his cabin as the crane fell to the ground and neither he nor other workers in the vicinity suffered injury RAM Rating Actual : Asset 1 Potential: People 4B 3 1 4 2 1. Parked position of Crane 2. Rigger in Container hung web sling 3. Crane fall position 4. Position of Assistance Rigger Supv Piping Engr Painting Shop Container Access Road FALLEN GROOVE CRANE Position of Rigger No. 1 /Container that was being loaded Position of Assistant Rigger Foreman Piping Engineer. CRANE ON GROUND WITH RETRACTED OUTRIGGERS Piping Engineer Rigging Supervisor’s Office Typical Crane with Fully Extended Outrigger 0703hrs: Crew had tool box talk 0805hrs: Crew of an operator, three riggers, one banks man and one flagman assigned lifting operation. Assignment was to lift a container already loaded with spool onto a truck for despatch to CPF. 0840hrs: Crew commenced second assignment of loading long pipe spools into 40ft container 0930hrs: Supervisor directed that loaded spools be offloaded from container as they can loaded directly onto the truck. 0955hrs: Long spools from container offloaded 1020hrs: Loading of short spools into open top 40ft container commenced. 1140hrs: Loading of spool into container still in progress. Crew breaks for lunch with assignment yet to be completed. 1305hrs: A rigger arrived from lunch Piping Manager saw crane key on his desk, expressed concern over delay in re-start of work after lunch. He gave the key to his piping engineer and instructed crew to resume work. 1320hrs: Operator arrives along with a second rigger. Ope
您可能关注的文档
- Computer vision - Wikipedia.pdf
- Computer vision algorithms for measurement and inspection of spur gears.pdf
- Computer+Systems+Validation+Masterclass.pdf
- Computer-Aided Design and Optimization of High-Efficiency LLC Series Resonant Converter.pdf
- Computer-aided design of gravity type vertical seawall .pdf
- computer-aided planning of distribution substation and primary feeders.pdf
- Computer-assistedteaching and learning in photogrammetry.pdf
- Computer-generated-Congestion-Control.pdf
- computer2.pdf
- computer3.pdf
最近下载
- 武汉农村商业银行2010年度报告pdf.pdf VIP
- 委托拍卖标的明细标准表格.docx VIP
- 脑膜炎(细菌性)和脑膜炎球菌病的识别、诊断和管理PPT 课件.pptx VIP
- 化脓性脑膜炎诊疗指南.pptx VIP
- 光宝EVO6800变频器说明书.pdf VIP
- DB31_T 1108-2018 监护型救护车配置规范(完整).pdf VIP
- 2025WHO《脑膜炎诊断、治疗和护理指南》解读PPT课件.pptx VIP
- 2025WHO《脑膜炎诊断、治疗和护理指南》解读PPT课件.pptx VIP
- 2025WHO《脑膜炎诊断、治疗和护理指南》解读PPT课件.pptx VIP
- 2025年高考数学试卷(广东)及全详细解析_v2.0.docx VIP
原创力文档

文档评论(0)