- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
挪威石油董事会油气储量分类标准和SPE的对比
Norwegian Petroleum Directorate (NPD–2001)
One of the principal tasks of the Norwegian Petroleum Directorate (NPD) is to maintain an overview of petroleum resources so that authorities can have the best possible basis for planning measures to ensure that they are well managed, and to forecast future production and activity.
The NPD’s annual updating of the resource account for expected recoverable resources focuses on classification by maturity. This system was developed in 1997. Based on experience gained in using the system and in cooperation with several oil companies, the NPD developed and published its current revised system in 2001. The current system builds on the SPE/WPC/AAPG 2000 classification but expands on the project maturity aspect.
The main principal in the NPD classification system is that originally recoverable resources in a field or discovery must be classified according to their position in the development chain, either from a discovery being made, or a new opportunity to increase recoverable resources in a field being identified, until production of the resources is complete. The system is designed to allow a single field or discovery being able to contain resources in different project status categories, i.e. resources at different stages of maturity in the development chain.
All resources must, as far as possible, be reported with a high and a low estimate in addition to the “base estimate”. This allows an opportunity to describe the uncertainty in the resource quantities in both the individual fields and the full resource account (total portfolio).
The resources are divided into ten different project status categories (Figure 1).
Figure 1: Norwegian Petroleum Directorate ClassificationCategories 0 to 7 cover the discovered, recoverable resources, Possible future measures to improve the recovery factor are placed in category 7 along with discoveries that have not yet been evaluated. Categories 6 and 9 cover undiscovered resources.
The “
您可能关注的文档
最近下载
- 秋季安全生产培训ppt.pptx VIP
- (完整word版)护理安全(不良)事件报告制度及工作流程.docx VIP
- 体育教学工作总结学情分析报告(共8).docx VIP
- 内部审核工作程序.pdf VIP
- 怪物猎人3金手指素材代码.doc VIP
- 马工程-中国古代文学史(第二版)第三编上册魏晋南北朝文学PPT课件-50109.docx VIP
- 传统节日中秋节介绍英文版ppt课件.pptx VIP
- 销售合同管理excel表格系统 台账登记统计 到期提醒Excel表格模板 (9).xlsx VIP
- 刘毅5000词汇.doc VIP
- 《单相全桥逆变器死区效应分析及补偿方法》-毕业论文(设计).doc VIP
文档评论(0)